Pre-Installation
Furnace Assembly
3-2
Thermo Scientific
3. Open the furnace door. Use both hands to pun the door handle away from the
furnace. The door moves away from the furnace and then swings to the left
(Refer to
Figure “Laboratory Box Furnaces”
4. Check that the thermocouple protrudes into the work area about 2.5 inches.
Make sure the thermocouple is not broken.
5. Check to make sure that the U (hot section) of each element is located
approximately 1/2 inch from the inside surface of each side chamber wall.
To adjust a heating element:
a. Hold the terminal end of the element.
b. Apply even pressure on each terminal to push the element through the
holes in the insulation.
6. Inspect the three cooling fans (refer to
). Make
sure the fans are undamaged and turn freely.
The door insulation plug should made properly with the furnace
vestibule opening.
Molybdenum disilicide heating elements are extremely fragile
and must be handled only with the greatest of care.
Содержание BF51634BC-1
Страница 1: ......
Страница 6: ...List of Figures ii Thermo Scientific...
Страница 20: ...Safety Notes Standards and Directives 1 14 Thermo Scientific...
Страница 48: ...Communication Option Auto Tuning the Controller 7 10 Thermo Scientific...
Страница 52: ...Excess Temperature Option B Models Excess Temperature Controller Operation 8 4 Thermo Scientific...
Страница 64: ...Troubleshooting 10 4 Thermo Scientific...
Страница 65: ......
Страница 66: ......
Страница 69: ...Thermo Scientific 12 1 12 Error Codes This chapter is not applicable...
Страница 70: ...Error Codes 12 2 Thermo Scientific...
Страница 72: ...WEEE Compliance 13 2 Thermo Scientific...
Страница 73: ...Thermo Scientific 14 1 14 14 Spare Parts and Accessories This chapter is not applicable...
Страница 74: ...Spare Parts and Accessories 14 2 Thermo Scientific...
Страница 76: ...Device Log 15 2 Thermo Scientific...