Installation
Final Inspection
4-4
Thermo Scientific
Final Inspection
Before initial start up, perform the following checks:
1. Check that all packaging materials have been removed from the furnace and
the control, including inside the furnace.
2. Check that the door insulation plug (refer to
Figure “Laboratory Box Furnaces”)
aligns with the furnace vestibule opening. This plug is designed to reduce heat
loss.
3. Inspect all three rear cooling fans for damage. Make sure they rotate and rum
freely (refer to
4. Visually inspect all electrical connections and make sure all access panels are
replaced.
Содержание BF51634BC-1
Страница 1: ......
Страница 6: ...List of Figures ii Thermo Scientific...
Страница 20: ...Safety Notes Standards and Directives 1 14 Thermo Scientific...
Страница 48: ...Communication Option Auto Tuning the Controller 7 10 Thermo Scientific...
Страница 52: ...Excess Temperature Option B Models Excess Temperature Controller Operation 8 4 Thermo Scientific...
Страница 64: ...Troubleshooting 10 4 Thermo Scientific...
Страница 65: ......
Страница 66: ......
Страница 69: ...Thermo Scientific 12 1 12 Error Codes This chapter is not applicable...
Страница 70: ...Error Codes 12 2 Thermo Scientific...
Страница 72: ...WEEE Compliance 13 2 Thermo Scientific...
Страница 73: ...Thermo Scientific 14 1 14 14 Spare Parts and Accessories This chapter is not applicable...
Страница 74: ...Spare Parts and Accessories 14 2 Thermo Scientific...
Страница 76: ...Device Log 15 2 Thermo Scientific...