Orbital Shaker 1-1
Thermo Scientific
Section 1
Installation
The MaxQ SHKE420HP Orbital Incubated Shaker is supplied with the
following materials:
1 - T-handle 5/32” hex socket wrench
2 - Platform alignment studs 1/4-20
6 - Grade 8, 5/32” hex socket flat head screws (provided with platform)
1 - Screwdriver for flask clip installation and removal
1 - Line cord set
2 - Cable mountable ferrites for remote alarm and RS-232 connections
1 - Platform (if applicable, must be ordered separately)
Warning
This shaker is heavy! The net weight of SHKE420HP is 185 lbs.
(83.9kg). Have assistance available when moving it. Place this unit on a
support surface that will accommodate the weight and operating motion of
this shaker.
s
The Orbital Shaker is secured to its shipping pallet with two brackets, one
on each side of the frame (Figure 1-1). A 7/16” wrench is required to
remove the brackets from the pallet. Remove the shipping brackets from
the shaker by unhooking them from the shaker frame.
Install the shaker on a sturdy table or bench. The support structure must
be able to accommodate both the weight and operating motion of the
shaker. The shaker can also be placed under a bench or in a “knee well.”
Remove the Pallet
Shipping Brackets
ORBITAL SHAKER
Pallet Shipping
Bracket
Figure 1-1.
Bracket
Location
Содержание 420 Series
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 57: ......
Страница 59: ......
Страница 60: ...Orbital Shaker 7 1 Thermo Scientific Section 7 Electrical Schematics ...
Страница 61: ...7 2 Orbital Shaker Thermo Scientific Section 7 Electrical Schematics ...
Страница 64: ...Orbital Shaker 9 1 Thermo Scientific ...
Страница 65: ......