Refrigeration Service Operations (Rev. 04/02)
80
3.
Solder the inlet and outlet connections. After the valve
cools, install the coil.
4.
Pressurize the refrigeration system and test for leaks.
5.
If no leaks are found, evacuate the system.
6.
Recharge the unit with proper refrigerant and check the
compressor oil.
Содержание SB-III 30 SR+
Страница 4: ......
Страница 8: ......
Страница 10: ...ii ...
Страница 14: ...4 ...
Страница 24: ...Unit Description Rev 04 02 14 Unit Photos Front View AGA231 ...
Страница 25: ...Unit Description Rev 04 02 15 1 Defrost Damper 2 X430 Compressor 3 TK 486 Engine Back View AEA698 2 3 1 ...
Страница 28: ...18 ...
Страница 66: ...56 ...
Страница 98: ...88 ...
Страница 110: ...100 ...
Страница 111: ...101 Early Model Coiled Wire Fuse Link Wiring Schematic ...
Страница 112: ...102 Early Model Coiled Wire Fuse Link Wiring Diagram Page 1 of 4 ...
Страница 113: ...103 Early Model Coiled Wire Fuse Link Wiring Diagram Page 2 of 4 ...
Страница 114: ...104 Early Model Coiled Wire Fuse Link Wiring Diagram Page 3 of 4 ...
Страница 115: ...105 Early Model Coiled Wire Fuse Link Wiring Diagram Page 4 of 4 ...
Страница 116: ...106 Late Model Fuse Link in Battery Cable Wiring Schematic ...
Страница 117: ...107 Late Model Fuse Link in Battery Cable Wiring Diagram Page 1 of 4 ...
Страница 118: ...108 Late Model Fuse Link in Battery Cable Wiring Diagram Page 2 of 4 ...
Страница 119: ...109 Late Model Fuse Link in Battery Cable Wiring Diagram Page 3 of 4 ...
Страница 120: ...110 Late Model Fuse Link in Battery Cable Wiring Diagram Page 4 of 4 ...