24
INSTALLATION INSTRUCTIONS
SacrIcIal anoDe maIntenance loG
note
The sacrificial anode must be checked by a qualified contractor 12 months after the unit has been installed
and checked periodically thereafter as advised by the qualified contractor. Failure to do so may void your
warranty.
Date unit was installed
12 month sacrificial
anode review date
C o m p l e te d
(yes/no)?
Was the anode replaced
(yes/no)?
Name of the qualified contractor
Next scheduled sacrificial
anode review date
C o mp l e te d
(yes/no)?
Was the anode replaced
(yes/no)?
Name of the qualified contractor
Содержание TIHP 300
Страница 1: ...INSTALLATION INSTRUCTIONS INTEGRATEDHEATPUMP300L FOR MODEL TIHP 300 OPERATION AND ...
Страница 2: ...2 INSTALLATION INSTRUCTIONS ...
Страница 25: ...INSTALLATION INSTRUCTIONS 25 Notes ...
Страница 26: ...26 INSTALLATION INSTRUCTIONS Notes ...
Страница 27: ...INSTALLATION INSTRUCTIONS 27 Notes ...
Страница 28: ...Works for you www reece com au Thermann 313698 37792 8934 ...