950-0211revA - 12 - March 7, 2014
Installation (CONT’D).
Step 12
Condensate Hose
Unit is provided with approximately 18'' of condensate hose. Hose connection is sized to accept a 5/8'' OD or
1/2'' ID clear plastic hose to then extend to building drain. Connect it to the gray condensate line coming from
the indoor unit.
All condensate hose extensions should be in accordance with local building codes. Remember water only
flows downhill to ensure positive draining from the unit. Check using water for a positive flow of condensate.
Route the condensate hose on the bottom of the bundle making sure it is not crushed when passing through
the wall.
OUTDOOR UNIT DRAIN (HEAT PUMP MODELS ONLY)
Insert drain fitting into the hole provided in the base pan. The 1/2" I.D. tubing can be connected to the fitting
directing the water away from the unit. Check to be sure the drain water is free to exit.
The basic system installation is now complete; the unit is ready for start up.