Manual No. 0-5164
4-7 OPERATION
ULTRA-CUT 400
4.04 First Time Operation Matching Gas Control to Lead Length
For initial operation of GCM2010 with software version 2.1 or later.
1. Before applying AC power set the Power Supply
ENABLE/DISABLE
switch on the gas control module to
DIS-
ABLE
.
2. Set Gas Selection switch to the correct position for cutting process being used.
3. Turn on AC power and set Power Supply
ENABLE/DISABLE
switch to
ENABLE
. After a short delay to establish
communications, the gas control will start the Purge and priming sequence. (If torch and coolant leads were
not already full of coolant you may be required to repeat this power on cycle and add coolant until the prim-
ing is complete).
4. Once the purge sequence is finished set the Mode Switch between Run and Set Precharge. Display says
“SET HOSE LENGTH” on the first line and LENGTH xxx FEET on the second. The xxx is most likely the
factory default of 175’ which is the system maximum.
5. Press in and hold the Current Control knob. Display changes to SELECT HOSE LENGTH and second line
steps downwards from 175’ to 50’ in 25’ increments. As soon as the correct length is displayed, release the
knob.
6. Set the Mode Switch back to Run.
7. The initial/first time set up is complete and does not have to be done again unless the Gas Control or it’s
main PC Board is replaced.
4.05 Sequence Of Operation
For first time operation see previous steps, “First Time Operation...”
1. Set the Plasma Power Supply
Enable / Disable
switch to
Disable
.
DANGER
Always shut off input power to the system before changing or inspecting torch parts.
a. Change the torch parts if necessary.
b. Set the Plasma Power Supply
Enable / Disable
switch (on the Gas Control Module) to
Enable
. The Module
performs purges of 15 seconds, 11 seconds, and another 11 seconds. This removes water from the torch
parts.
2. Select the desired plasma and shield gas by setting the Gas Selection switch to the desired position. 2 sec-
onds after gas selection, the module purges the new gas(es) through the leads.
3. Set the preflow gas pressure.
a. Set the MODE switch to SET PREFLOW.
b. Use the PREFLOW control knob to set preflow gas pressure. Refer to the torch manual for pressure set-
tings.
c. Use the AMPERAGE SET-UP control knob to set the desired pre-charge pressure set point.
Press
the control knob for 2 seconds without rotating. Then rotate the knob to adjust pressure.
4. Set the plasma and shield gas pressures and flows.
a. Set the MODE switch to SET PLASMA & SHIELD.
b. Use the PLASMA and SHIELD control knobs, pressure gauges, and flow meters to set plasma and shield
gas pressures and flows. Refer to the torch manual for pressure settings.
c. In installations using water shield, use the H
2
O MIST control knob and flow meter to set water flow rate.
Refer to the torch manual for flow rates.
Содержание Ultra-Cut 400
Страница 2: ...Blank...
Страница 4: ...Blank...
Страница 6: ...Blank...
Страница 10: ...This page intentionally blank...
Страница 11: ...Insert Table of Con tents tab here Discard this sheet...
Страница 12: ...This page intentionally blank...
Страница 16: ...TABLE OF CONTENTS This Page Intentionally Blank...
Страница 24: ...ULTRA CUT 400 GENERAL INFORMATION 1 8 Manual 0 5164 This Page Intentionally Blank...
Страница 25: ...ULTRA CUT 400 Manual 0 5164 1 9 GENERAL INFORMATION Insert Section 2 tab here Discard this sheet...
Страница 26: ...ULTRA CUT 400 GENERAL INFORMATION 1 10 Manual 0 5164...
Страница 36: ...SPECIFICATIONS 2 10 Manual No 0 5164 ULTRA CUT 400 This Page Intentionally Blank...
Страница 37: ...Manual No 0 5164 2 11 SPECIFICATIONS ULTRA CUT 400 Insert Sec 3 tab here discard this sheet...
Страница 38: ......
Страница 86: ...INSTALLATION 3 48 Manual No 0 5164 ULTRA CUT 400 This Page Intentionally Blank...
Страница 87: ...Manual No 0 5164 3 49 INSTALLATION ULTRA CUT 400 COPY CENTER Insert Sec 4 tab here discard this sheet...
Страница 88: ...Blank...
Страница 104: ...OPERATION 4 16 Manual No 0 5164 ULTRA CUT 400 This page intentionally blank...
Страница 105: ...Manual No 0 5164 4 17 OPERATION ULTRA CUT 400 COPY CENTER Insert Sec 5 tab here Discard this sheet...
Страница 106: ...This page intentionally blank...
Страница 110: ...MAINTENANCE 5 4 Manual 0 5164 ULTRA CUT 400 This Page Intentionally Blank...
Страница 111: ...Manual No 0 5164 5 5 MAINTENANCE ULTRA CUT 400 Insert Sec 6 tab here Discard this sheet...
Страница 112: ...MAINTENANCE 5 6 Manual 0 5164 ULTRA CUT 400 This page is blank intentionally...
Страница 139: ...Insert Sec 7 tab here Discard this sheet...
Страница 140: ...Blank...
Страница 147: ...Manual 0 5164 7 7 TORCH INFORMATION ULTRA CUT 400 Insert Section 8 and Section 8 tab here Discard this sheet...
Страница 148: ......
Страница 158: ...APPENDIX A 10 Manual 0 5164 ULTRA CUT 400 This Page Intentionally Blank...
Страница 163: ...Manual 0 5164 A 15 APPENDIX ULTRA CUT 400...
Страница 177: ...This Page Intentionally Blank...