Controller Control Fault Logic ......................................................................................................................................................................... 8
Draining the Mold ................................................................................................................................................................................................ 8
Start-up ..................................................................................................................................................................................................................... 8
Step 1 – Connect Main Power ......................................................................................................................................................................... 9
Table 1 - Fill Water Chemistry Requirements ................................................................................................................................. 10
Table 2 – Recommend Glycol Solutions ........................................................................................................................................... 10
Step 3 – Start the Unit....................................................................................................................................................................................... 10
Step 4 – Check Pump Rotation...................................................................................................................................................................... 10
Step 5 – Enter Set Point Temperature ........................................................................................................................................................ 10
Setting Set Point Temperature ............................................................................................................................................................. 10
Step 6 - Adjusting the Vacuum ..................................................................................................................................................................... 11
Preventive Maintenance ................................................................................................................................................................................... 11
Once a Week ........................................................................................................................................................................................................ 11
Once a Month ...................................................................................................................................................................................................... 11
Once a Year ........................................................................................................................................................................................................... 11
General Troubleshooting ................................................................................................................................................................................. 12
Charts and Drawings ......................................................................................................................................................................................... 13
Figure 1 – Pump Performance (60 Hz) .............................................................................................................................................. 13
Figure 2 – Cooling Capacity .................................................................................................................................................................. 14
Figure 3 –High Voltage Wiring Diagram .......................................................................................................................................... 15
Figure 4 – Low Voltage Wiring Diagram .......................................................................................................................................... 16
Figure 5 – Control Board Details ......................................................................................................................................................... 17
Figure 6 – Heating Element Details .................................................................................................................................................... 18
Figure 7 – Principle of Operation ........................................................................................................................................................ 19
Содержание Vactherm RV
Страница 1: ......
Страница 2: ......
Страница 17: ...13 Charts and Drawings Figure 1 Pump Performance 60 Hz...
Страница 18: ...14 Figure 2 Cooling Capacity...
Страница 19: ...15 Figure 3 High Voltage Wiring Diagram...
Страница 20: ...16 Figure 4 Low Voltage Wiring Diagram...
Страница 21: ...17 Figure 5 Control Board Details...
Страница 22: ...18 Figure 6 Heating Element Details...
Страница 24: ...20 Notes...
Страница 25: ...21 Notes...
Страница 26: ...22 Notes...
Страница 27: ......