Step 2 cont.: Check and Prepare Opening. 

 

Check to be sure the framing walls around the 
opening are in the same plane.  Do this by 
performing a “string test” for plumb.

 

 
String Test for Plumb: Attach a string diagonally 
across the opening from the outside, as shown.  The 
string(s) should gently touch in the center, if not the 
opening is “out of plumb” by twice that distance 
and needs to be corrected.  Flip the string over 
itself to check both planes. 

Fix any problems now.

 

 
*An “out of plumb” condition is one of the most 
common reasons door units leak air and water. 
 

 

Step 3: Caulk the Sub Floor. 

 

On the sub floor at opening, place 3 very large beads 
of sealant. Run beads full width of the opening. 
 

Use Only

 Elastomeric or Polyurethane sealant. 

 

Use an Entire Tube when Caulking along the Sub 
Floor. 
 

 
 
 
 

 

Step 3A: Installation with a Sill Pan. 

 
Place the right and left sill pan ends onto the caulk beads and tightly against 
the side of the opening. 
 
Then, liberally coat the overlapped areas and the recessed areas of the pieces 
with the PVC cement provided.  Place center section(s) in position and hold 
pieces together long enough to ensure a good bond. 
 
For added protection, spread a bead of caulk along the glue joints and to 
prevent air infiltration, run a bead of caulk along the lower interior edge of the 
sill pan.  Additional caulking could affect the performance of the sill pan. 

 
Do Not Caulk the bottom of the Sill when using a sill Pan. 

 

Step 3B: Installation without a Sill Pan. 

 

Lay the door unit on edge or face so 
that the bottom surface of the sill 
can be caulked.  Place very large 
beads of caulk across the full width 
of the sill. Additionally, place beads 
of caulk along the junction of the 
sill and the jamb and on the bottom 
surface of the jambs and 
brickmould.

 

 

Note: 

If a sill extender is used, place a large bead of caulk at the junction of 

the extender and the sill approach. 

Step 3 cont.: Caulking Back side of Brickmould. 

 

Important! 

Apply sealant to the back side of 
brickmould around the entire perimeter 
of the door unit.  A 1/2 – 5/8 inch bead 
of Elastomeric or Polyurethane caulk is 
essential. 

 

 

 

 

 

Step 4: Place Unit in Opening and Temporarily Fasten. 

 

Lift the unit up.  With top edge tilted away from 
opening, center the unit and place sill down onto 
sill pan or caulk beads and tilt into opening. 
 
For all door unit configurations, note the hinge 
locations and mark those locations on the jamb 
faces near the door surfaces.  Pre-drill 1/8 inch 
diameter holes at these locations for screw 
placement.  A counter sink bit will help to 
conceal the screw heads. 
 
Install screws in the center pre-drilled hole 
locations on both jambs to 

temporarily

 secure 

the unit in the place.  Do not drive screws 
completely in at this time. Use #8 X 2-1/2 inch 
or 3 inch exterior grade screws. 

 
 

Do Not Fasten through the Brickmould. 

 

Step 4 cont.: Plumb Hinge Side Jamb. 

 

Work from side of the door that is weather-stripped. 
 
Use a 6 foot level and plumb the hinge side jamb both ways (right to left and 
inside to outside). 
 
Place screws through the hinge side jamb into the studs, at each remaining 
hinge location, as shown in the diagrams.  Use #8 X 2-1/2 inch or 3 inch 
exterior grade screws. 
 

Do Not,

 drive the screws completely in at this time. 

 
For Single or Double Doors, place screws at each hinge location, so shims can 
be placed behind hinges above screws.  The screws will keep the shims from 
falling down while adjustments are being made. 
 
For Sidelite units, fasten the jamb on the hinge side of the door. 
 
For Double Door and Patio Units, fasten the fixed or passive side of the unit 
first. 
 

 

           Single Unit                       Sidelite Unit                        Double Unit 

Содержание Pre-hung Door Systems

Страница 1: ...rrier and Flexible Flashing We recommend the use of a Water Resistive Barrier WRB applied to the exterior sheathing OSB or other and the use of an adhesive or flexible flashing product to seal around...

Страница 2: ...e jamb and on the bottom surface of the jambs and brickmould Note If a sill extender is used place a large bead of caulk at the junction of the extender and the sill approach Step 3 cont Caulking Back...

Страница 3: ...ole locations closest to the weatherstrip Close the door and carefully shim between the jamb and the opening behind the adjustable strike plate area Then open the door and drill 1 8 inch dia pilot hol...

Страница 4: ...o paint Doors Clean first with mild detergent and water or use a TSP tri sodium phosphate solution Rinse well and allow to dry completely Mask off hardware glass and remove weatherstripping before pai...

Страница 5: ...uctos adhesivos o de tapajuntas flexibles para sellar el per metro de la abertura Se debe cortar la WRB en la abertura siga las pautas del fabricante con el cabezal de la leng eta cubierta con cinta a...

Страница 6: ...mba y en la superficie inferior de las jambas y las molduras Nota si usa una extensi n para alf izar coloque un cord n de masilla de calafateo grande en la uni n de la extensi n y la entrada del alf i...

Страница 7: ...cios gu a de 0 32 cm de di metro e instale los tornillos largos para bisagra en las ubicaciones de orificio m s cercanas al burlete Cierre la puerta y coloque calzas cuidadosamente entre la jamba y la...

Страница 8: ...No aplique acabados bajo la luz solar directa Puertas de acero y Smooth Star Para pintar puertas primero limpie con un detergente suave y agua o use una soluci n de TSP fosfato tris dico Enjuague bie...

Отзывы: