PROVIDENCE INSERT
PELLET STOVE
22
SURROUND INSTALLATION
1. To install the surround onto the stove engine, first make sure hopper flange assembly located on top of
engine can move freely by loosening the four flange stud locknuts. Two in the front and two in the back.
Also loosen lower supplied L mount brackets.
2. Carefully position the surround assembly around the stove engine and center the assembly so that there
are even gaps around the firebox by lining up the bottom previously loosened L mount brackets with the
surround’s predrilled holes.
3. Then move hopper flange previously loosened and mate to the underside of top inside of the surround
allowing the gasket to meet up with the surround. Tighten the 4 previously loosened locknuts. Tighten
the lower L mount brackets with the 2 supplied 10-32 x
3/8
”
slotted hex-head screws.
4. Install the hopper door assembly by loosening the 4 supplied flange lock nuts (2 on the left, 2 on the
right) onto the hopper flange assembly.
5. Once the door is seated on the flange studs, tighten the 4 previously loosened flange lock nuts.
FIGURE 11
–
SURROUND INSTALLATION
Содержание providence
Страница 6: ...PROVIDENCE INSERT PELLET STOVE 6 LABORATORY LISTING LABEL...
Страница 8: ...PROVIDENCE INSERT PELLET STOVE 8 FIGURE 1 STOVE DIMENSIONS...
Страница 19: ...PROVIDENCE INSERT PELLET STOVE 19 FIGURE 8 ADJUSTABLE HOPPER ASSEMBLY...
Страница 20: ...PROVIDENCE INSERT PELLET STOVE 20 FIGURE 9 CONTROL PANEL...
Страница 31: ...PROVIDENCE INSERT PELLET STOVE 31 FIGURE 13 CLEAN OUT COVERS FIGURE 14 CLEAN OUT VENT PORT...
Страница 32: ...PROVIDENCE INSERT PELLET STOVE 32 FIGURE 15 COMBUSTION FAN...
Страница 37: ...PROVIDENCE INSERT PELLET STOVE 37 FIGURE 18 ELECTRICAL SCHEMATIC WIRING DIAGRAM...
Страница 40: ...PROVIDENCE INSERT PELLET STOVE THELIN HEARTH PRODUCTS 63 Laxalt Dr Carson City NV 89706...
Страница 41: ......