background image

Figure 6.2.2

Master Override Setup

6.2.2 MASTER OVERRIDE FEATURE 

Any operator station with a communication board can be reconfigured with the master override feature.  These stations include the 
Y4E-RP, Y4E-RO, Y4E-CT-30, Y4E-CT-100, Y4E-TS, or any inputs connected to an Y4E-COMM.  To enable the master override feature 
on an operator station follow these steps:

1. Remove lid from enclosure.
2. Locate DIP switches on communication board.
3. Slide DIP switch #1 to the ON position.
4. Replace lid.   Verify rubber seal is clean and undamaged.   Verify that no wires are caught between lid and box.

6.2.3 STOW FEATURE 

The STOW position needs to be programmed before use.   The monitor needs to “find” two (2) hard stops, one for each axis, before the 
monitor can move to the STOW position. When programming, the first two commands teach the monitor where to find the hard stops. 
This insures that the position is accurate.  From that point, the operator can program the move to the STOW position. During normal 
operation, each time the STOW button is pressed, the monitor moves the nozzle to the full straight stream position, moves to each 
programmed hard stop, and then moves to the STOW position. While the monitor is performing the STOW feature, pressing any button 
will stop the monitor.

6.2.3.1 PROGRAMMING

Press & hold STOW button (~10 seconds) until LED blinks.   Release button.   LED will continue to blink while in program mode.

FIRST AXIS TO MOVE:

Press & release LEFT/RIGHT or UP/DOWN button of axis that will move first to hard stop.   LED will blink when hard stop is reached.

SECOND AXIS TO MOVE:

Press & release LEFT/RIGHT or UP/DOWN button of axis that will move second to hard stop.   LED will blink when hard stop is reached.

MOVE TO STOW POSITION:

Use LEFT/RIGHT or UP/DOWN buttons to move monitor to first point of stow routine, press & release STOW button. LED will blink 
rapidly to acknowledge position.

Repeat until pattern is complete (up to 10 points).

Press & hold STOW button until LED turns off.   Release button.

6.2.3.2 STOW PROGRAMMING EXAMPLE

- Press & hold STOW button until LED blinks.

- Press & release UP button, monitor will move until hard stop reached.   LED blinks rapidly.

- Press & release RIGHT button, monitor will move until hard stop reached. LED blinks rapidly.

- Press LEFT button to move 45 degrees, Press & release STOW button. LED blinks rapidly.

- Press DOWN button to move 90 degrees, Press & release STOW button. LED blinks rapidly.

- Press & hold STOW button until LED turns off.

O

N

  

 C

T

S

1

2

3

4

27

Содержание HURRICANE XFIH-E1*A Series

Страница 1: ...e of this equipment A person who has not read and understood all operating and safety instructions is not qualified to operate the Hurricane RC monitor DANGER This instruction manual is intended to fa...

Страница 2: ...4 OSCILLATE FEATURE 4 5 PRESSURE GAGE PORT 6 2 4 1 PROGRAMMING 4 6 AUTOMATIC DRAIN 6 2 5 OPERATOR STATION PANELS 5 0ELECTRICAL CONTROLS INSTALLATION 6 3 OVERRIDE HAND WHEELS 5 1 PRIMARY MONITOR OPERAT...

Страница 3: ...Field changeable horizontal rotation stops at 45 90 and 135 either side of center position Elevation range is 90 above horizontal and 45 below Designed for field changeable 12 or 24 volt dc operation...

Страница 4: ...F to 120 F 34 C to 49 C Environmental Rating All components designed to meet minimum rating of NEMA 4 IP65 3 2 PART IDENTIFICATION AND MODELS The Hurricane RC Monitor as shown in Figure 3 2 along with...

Страница 5: ...Various other inlet fittings and outlets are available as shown in Figure 3 4 5 FIG 3 3 Inlets And Outlets 2 5 7 5 NH 65mm MALE 2 5 11 BSP 65mm MALE 2 5 11 5 NPSH 65mm MALE SPECIAL THREADS CODE RLF FE...

Страница 6: ...3MM 15 43 15 43 15 43 392MM 392MM 392MM 7 90 7 90 7 90 201MM 201MM 201MM 10 74 10 74 10 74 273MM 273MM 273MM 5 89 5 89 5 89 150MM 150MM 150MM 3 64 3 64 3 64 93MM 93MM 93MM SHOWN SHOWN SHOWN WITHOUT WI...

Страница 7: ...and external gears 3 5 4 MOTOR SLOW FAST SPEED When an operator presses one of the buttons the associated motor starts in slow speed mode so that the operator can accurately control the water stream A...

Страница 8: ...degree apart threaded crossholes will give desired direction relative to the Straight Ahead Reference Mark when the monitor is installed 2 Screw monitor onto inlet adapter or Extend A Gun RC until thr...

Страница 9: ...lamp on the monitor and the wire clamp on the Extend A Gun RC Install the wire so that it winds one and a half times around the Extend A Gun RC Conical Guard WHEN EXTEND A GUN RC IS FULLY EXTENDED FAC...

Страница 10: ...le connectors Any other nozzle should have the corresponding male electrical connector installed and long enough wire to extend 90 above horizontal and 45 below elevation movement of the nozzle DO NOT...

Страница 11: ...or the hurricane rc monitor is limited to 450 degrees or 225 degrees from either side of a nozzle discharge position Horizontal left right travel stop bolts may be installed in the monitor to limit tr...

Страница 12: ...to control box with plastic wire ties or cable clamps to relieve stress on the cables Disconnect power before installing or servicing the electrical components The RC monitor control boxes and motors...

Страница 13: ...wireless joystick or tether operator station The enclosure is designed to be recess mounted in a panel 5 1 1 MOUNTING Select proper operator location Panel space required will be 5 6 x 7 9 142 x 200mm...

Страница 14: ...BLACK BLACK GREEN BLACK UP WHITE BLACK DOWN WHITE LEFT ORANGE BLACK RIGHT BLUE FOG ORANGE STRAIGHT STREAM GREEN NOT USED CUT MAIN POWER CONNECTION TO TRUCK Route cable and connect to a protected circu...

Страница 15: ...RE CAUGHT BETWEEN LID AND BOX USE SUPPLIED FLAT HEAD SCREWS WITH O RING SEALS TIGHTEN SCREWS SECURELY 6 PLACES FIG 5 1 2D Wireless Operator Station Connections WIRELESS STATION ONLY WIRELESS OPERATOR...

Страница 16: ...t primary or optional operator station if multiple recessed operator stations are installed refer to section 5 2 The holster is supplied with 20 stainless steel self tapping screws Make sure the mater...

Страница 17: ...correct pilot hole size 5 3 2 RECEPTACLE MOUNTING Select proper location for mounting receptacle Receptacle is 1 x 1 and deep Allow extra room behind receptacle for wires Refer to Figure 5 3 2 for cut...

Страница 18: ...ction 3 2 for electrical specifications 5 4 3 MOUNTING CHARGING CRADLE Select proper location for mounting cradle The cradle is not weatherproof and needs to be inside a protected location such as in...

Страница 19: ...ystick up to 22 degrees in either direction To rotate joystick lift the rubber boot to expose adjustable clamp Loosen the clamping screws rotate the joystick to desired position and tighten clamping s...

Страница 20: ...ication Interface Box Fig 5 5 2 1 Joystick Operator Station Wiring to Communication Interface Box Y4E COMM COMMUNICATION INTERFACE BOX FACTORY CONFIGURED FOR GROUND INPUTS TO CONFIGURE FOR VOLTAGE 12V...

Страница 21: ...OPER STATION Refer to section 5 1 2D 21 WATER VALVE CONNECTION TRIGGER ACTUATION SWITCHES ORANGE WIRE TO GROUND 5 AMP SWITCH CONTACT RATING WHEN SWITCHING A RELAY OR SOLENOID INSTALL A SUPPRESSIO DIOD...

Страница 22: ...s are caught between lid and box Figure 5 7 3 Communication Interface Box MOVE JUMPER TO BOTH PINS 22 5 6 2 ELECTRICAL WIRING See section 5 1 2C if connecting to a primary operator station See Section...

Страница 23: ...ed by only a tether operator station see Figure 5 9 See section 5 3 for holster and receptacle mounting Wire receptacle cable into installer supplied terminal box and connect Route cable from monitor...

Страница 24: ...NG Select proper enclosure location Enclosure is designed to be surface mounted and the size is 5 3 4 x 8 3 4 146 x 222mm Height of enclosure is 2 1 4 57mm Refer to Figure 5 10 1 for mounting hole dim...

Страница 25: ...ritical Voltage supplied to ELECTRICS ENCLOSURE should not fall below 11 volts when monitor is in operation Recommend Cable Gauge Max Length Gauge 4 0 f t 1 4 A W G 6 5 f t 1 2 A W G 80 ft 2 14AWG 105...

Страница 26: ...rgeable batteries that will give 160 hours of continuous operation when fully charged when not in use the wireless transmitter should be kept in it s charging base The transmitter will turn on a red L...

Страница 27: ...stop and then moves to the STOW position While the monitor is performing the STOW feature pressing any button will stop the monitor 6 2 3 1 PROGRAMMING Press hold STOW button 10 seconds until LED bli...

Страница 28: ...urns off Release button Figure 6 2 4 1 Operator Station Label 6 2 5 OPERATOR STATION PANELS The operator stations are all equipped with the same monitor movement functions From the operator stations t...

Страница 29: ...er 28 2 Turn over the rubber drain valve 32 so that the raised edge is facing down against the face of the housing 31 3 Reinstall the washer and screw Reinstall the drain assembly 6 4 RECOMMENDED MONI...

Страница 30: ...Reaction Flow Reaction Flow Reaction Flow Reaction inches GPM lbf GPM lbf GPM lbf GPM lbf 1 375 360 120 440 180 500 240 560 300 1 50 420 140 520 210 600 280 670 350 1 75 580 190 700 290 810 380 910 48...

Страница 31: ...ISTANCE FEET VERTICAL DISTANCE FEET VERTICAL DISTANCE M 0 0 40 0 80 0 20 0 60 0 HORIZONTAL DISTANCE M 1 375 INCH TIP 0 10 20 0 20 40 60 80 0 0 40 0 80 0 120 0 160 0 200 0 240 0 280 0 40 PSI 60 PSI 100...

Страница 32: ...ch 0 40 80 120 160 200 240 280 320 0 20 40 60 80 100 120 140 160 VERTICAL DISTANCE FEET HORIZONTAL DISTANCE FEET 80 20 40 60 0 20 40 0 HORIZONTAL DISTANCE METERS VERTICAL DISTANCE METERS 2 0 INCH TIP...

Страница 33: ...STREAM STRAIGHTENERS 6 6 3 HURRICANE RC MONITOR FRICTION LOSS The friction loss of the Hurricane RC Monitor is shown below in Fig 6 6 3 FIG 6 6 3 Hurricane Monitor Friction Loss 0 0 5 0 10 0 15 0 20...

Страница 34: ...or replace damaged parts Grease see section 8 1 Clean out debris or replace damaged parts Grease see section 8 1 Check wiring and reverse polarity Check connections and wiring per section 5 1 2 Check...

Страница 35: ...the HURRICANE RC monitor after repairs are made or any time a problem is reported to verify operation in accordance with Task Force Tips test procedures Consult the factory for the test procedure that...

Страница 36: ...0 18 18 18 19 19 19 25 25 25 26 26 26 27 27 27 28 28 28 29 29 29 30 30 30 33 33 33 31 31 31 32 32 32 28 28 28 34 34 34 35 35 35 18 18 18 40 40 40 41 41 41 42 42 42 36 36 36 37 37 37 38 38 38 39 39 39...

Страница 37: ...DWHEEL 1 X281 24 1 4 20 x 1 2 BHCS 2 VT25 20BH500 25 O RING 350 1 VO 350 26 BALL 5 16 TORLON 49 98 VB 312TO 27 BASE CODE RLF 3 ALUM 1 Y4405A 28 FLAT WASHER 1 4 3 VW687X281 50 29 1 4 28 x 1 2 BHCS 2 VT...

Страница 38: ...OCKET SLAVE 1 X254 6 SPROCKET DRIVE 1 X253 7 BUSHING MOTOR 1 X256 8 COVER 1 X257 9 1 4 28 x 1 2 BHCS 1 VT25 28BH500 DESCRIPTION QTY PART 1 6 32 x 5 16 LONG SHCS WITH HEAD SEAL 4 VT06S32SH312 2 CUP SEA...

Страница 39: ...135 9 BOARD MOTOR CONTROL 3 Y5100 10 BOARD MAIN 1 Y5105 11 V10 32 x 1 4 SET SCREW 1 VT10Y32SS250 12 O RING 018 2 VO 018 13 CONDUIT HOSE FITTING 2 Y5213 14 FEMALE PLUG 2 POLE 10 0 TOTAL 5 0 EXPOSED CAB...

Страница 40: ...f any liens and encumbrances This is a limited warranty The original purchaser of the equipment any person to whom it is transferred and any person who is an intended or unintended beneficiary of the...

Отзывы: