10
Chute discharger control knob
1. Pull the discharge cable from the control panel and align.
2. Attach discharge cable onto the discharge bracket on the chute.
3. Pull cable further to the adjustable guard
4. Insert tip of discharger cable onto the adjuster bolt of the guard
5. Adjust and tigten the cable on the discharge guard nut.
6. Check the tension of the cable by pulling the handle
Skids
1. Attach the skids to auger house
2. Insert M8X16 bolt and M8 Washer and tighten loosely with nut
3. Adjust the skids the auger house so they are level with ground.
4. Fasten the M8X16 bolt with nut.
Содержание Snowbuster 1100E
Страница 7: ...7 IDENTIFICATION OF CONTENT ...