7 Steps to Operation
18
P5000HX(-M)-WMB Series Motherboard
Service Manual
Overview
After you have installed the P5000HX(-M)-WMB and connected all devices, power-on
the system.
No Power
If the system does not power-on, check all power connections and the power source.
If power connections are secure and the power source is adequate, contact Technical
Support at (800) 627-8700 or (713) 541-8200 between 7:00 a.m. and 6:00 p.m., Central
Time, USA. For more information, see “Customer Support,”
page v
.
Startup
After you power-on the system, it will:
•
Execute the Power-On Self Test (POST) to ensure that the system is functional and
properly configured
•
Start the operating system
Setup
During the POST, you can access the Setup Utility (
Figure 9
) to configure the system.
Step 6: Power-On the System
Before using the motherboard for the first time, you should verify the system
settings in the Setup Utility. See
page 20
.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com