6.2.3 I
nstallation of the float
If the float (GTP) is supplied dismantled, it has to be fixed cor
-
rectly on the body of the machine.
NOTE
The operations indicated below are only carried out prior to the
connection of the cooler
.
ATTENTION
For installation, follow the pictures below, paying attention to the
reference points highlighted.
Once the adjustment of GTP has been finished, continue by
fitting it to the floating valve as shown in the picture below, by
fastening the threaded ring.
Attach the hydraulic supply connection (not supplied) directly to
the 1” M connection of GTP, by carefully passing it through the hole
specially made in the special column
.
6.2.4 Installation of the panel group
If the cooler is supplied with panels dismantled, they have to be
fitted correctly to the body of the machine.
NOTE
The operations indicated below are only carried out prior to the
connection of the cooler.
ATTENTION
For installation, follow the pictures below, paying attention to the
reference points highlighted.
1
2
Join 2 panels PERIcool
®
and 2 distributors PERIcool
®
and insert
them into the metal structure as shown in the pictures below. Re
-
peat for the other panels.
TE 6x16
x4
6x18
x4
Position the panel group at an angle in one of the three spaces
by inserting it from the bottom (as shown in the picture) and then
turn it upright and secure it by means of 2 screws and two rings
placed in the points highlighted.
Repeat the operation to position the other two groups of panels.
Locking Torque
10 Nm