DEAR CUSTOMER
Congratulations on having chosen
termet
product.
We offer you modern, economical and environmentally friendly product, meeting particularly high requirements of European Standards. Please read this instruction
manual carefully as the knowledge of service rules and manufacturer’s recommendations are the conditions of reliable, efficient and safe operation of the appliance.
Please keep this instruction manual for the whole operation life of the boiler.
We wish you satisfaction in using our product.
termet
IMPORTANT TIPS
•
Read the instruction manual before you perform the installation and operation of the boiler.
•
This instruction manual is an integral equipment of the boiler. It should be kept through the whole operation life of the boiler and carefully read. It contains all
the information and warnings for safety during installation, use and maintenance to be followed.
•
The boiler is complicated appliance as it contains numerous precise mechanisms.
•
Reliable operation of the boiler depends mainly on appropriate performance of systems that boiler cooperates with such as:
- gas system,
- flue gas-air system,
- central heating system,
- domestic hot water system.
•
Flue gas - air installation for C type boilers should be made of separately approved and introduced on the market gas - air system. Adapters connecting the
boiler with a pipe system must have a measuring points. Flue gas
– air system must meet the specifications set out in section 3.8 of this manual.
•
Flue gas - air system must be tight. Leaks on the connections of flue gas pipes can result in flooding of the boiler by condensate. Manufacturer is not liable
for damage and malfunction of the boiler arising out from above mentioned reason.
•
Installation of the boiler should be performed only by a qualified person
1)
. Make sure that the installer has confirmed in writing the tightness of the
gas installation had been checked after connecting the boiler to the system.
•
Boiler may be installed and operated only in a room where all building works have been completed. It is not allowed to install and operate the boiler in a room
where building works are still in progress.
•
The cleanliness of air in a room where the boiler will be installed must meet the same requirements as for rooms designer for people.
•
There should be installed appropriate filters on a central heating system and gas system . Filters are not included in a basic boiler equipment.
•
An example of connecting a boiler to these systems is presented on fig. 3.5.1.
•
All defects caused by lack of filters on central heating or gas supply will not be repaired under guarantee
.
•
Central heating system must be thoroughly rinsed with water, cleanliness of the heating water should be comparable to cleanliness of domestic water.
•
To avoid malicious calcification process of flue gas - water heat exchanger there should be:
- proper tightness of central heating system ensured by avoiding frequent refilling it with water,
- the water hardness checked, if it exceeds 15
O
n it should be softened by using of softeners available on the market,
- written confirmation of the analysis of water hardness ensured; in the absence of such confirmation any claim under flue gas-water heat exchanger
calcification will not be included under warranty.
•
The initial start-up of the boiler as well as its repairs, adjustments and maintenance works must be performed only by AUTHORISED SERVICE COMPANY.
•
The boiler must be operated only by an adult.
•
Do not do any repairs and modifications by yourself.
•
Do not cover any ventilation grilles.
•
Do not keep in the vicinity of the boiler any containers with flammable, aggressive and corrosive liquids and other similar substances.
•
Any failures that are result of operation discordant to recommendations included in this instruction manual can not be subject to warranty claims.
•
Manufacturer is not responsible for any failures being the result of faults during the process of installation and inobservance the regulations and instructions
given by the manufacturer.
•
Complying with recommendations given in this instruction manual ensures a long, reliable and safe operation of the boiler.
When you smell gas:
- do not use any electrical switches that could cause any spark,
- open the door and windows,
- shut down the main gas valve,
- contact your gas supplier.
In case of any failure you should:
-
disconnect the boiler from a power source,
- shut down the gas supply valve,
- cut off a water supply and drain a water from the boiler and whole central heating system as well (when there is any risk of
freezing of the system),
- drain the water from the system in any case of leakage that could cause a flood ,
- contact the nearest
AUTHORISED SERVICE COMPANY
or the producer.
1)
‘Qualified person’, means the one that has all required technical qualifications in an area of doing all the works necessary to connect appliances to the gas mains, central heating system and flue
gas duct, accordingly to local regulations.