Seventh Edition • First Printing
Operator's Manual
Inspections
Part No. 1297932GT
Z
®
-30/20N • Z
®
-30/20N RJ
27
At the Ground Controls
1
Select a test area that is firm, level and free of
hazards.
2
Turn the key switch to ground control.
3
Pull out the red Emergency Stop button to the
on position.
Result: The beacon (if equipped) should flash.
Test Emergency Stop
4
Push in the ground red Emergency Stop
button to the off position.
Result: No functions should operate.
5
Pull out the red Emergency Stop button to the
on position.
Test the Boom Functions
6
Do not hold the function enable
switch to either side. Attempt to
activate each boom and platform
function toggle switch.
Result: No boom and platform functions should
operate.
7
Hold the function enable switch to either side
and activate each boom and platform function
toggle switch.
Result: All boom and platform functions should
operate through a full cycle.
Test the Tilt Sensor
8
Turn the key switch to
platform control. Pull out the
platform red Emergency
Stop button to the on
position.
9
Open the control panel side
turntable cover and locate
the tilt sensor next to the
function manifold.
10
Press down one side of the tilt sensor.
Result: The alarm, located in the platform,
should sound.
Test Auxiliary Power
11
Turn the key switch to ground control.
12
Pull out the red Emergency Stop button to the
on position.
13
Simultaneously hold the auxiliary
power switch on and activate each
boom function toggle switch.
Note: To conserve battery power, test each
function through a partial cycle.
Result: All boom functions should operate.
Содержание Genie Z-30N
Страница 59: ......