* Emergency stop: see chapter 2.1
12
Fig. 4-1
Fig. 4-2
4.0
SETTING UP / MOUNTING OF THE MACHINE.
Be careful! There is a danger of being crushed
when working implements are fitted and
connected. Carry out the fitting procedures slowly and carefully, and use separate and
approved lifting equipment to make the work easier. See section 2 on safety regulations and
pay attention to the various safety decals displayed on different parts of the bale wrapper.
4.1
HINGED TOWER.
Because of the freighting of the machine, AUTO WRAP 1500 / 1514 is sometimes delivered with the
tower hinged down. Before use, the tower must be lifted up and fastened with 5 pcs. 16mm bolts.
Figure 4-1 shows the machine at delivery.
Remove all packing strips and lift up the tower. Use a crane or the front-loader on the tractor and lift
in the liftingpoint at the top of the machine. (See arrow).Then mount the 5 pcs. M16 x 55 bolts with
washers and lock nuts.
Securing the davit on TWIN machines is slightly more complicated because of the bracing clamps
which have to be fitted on each side of the davit. Fit the lower fixing screws for the clamps (8 screws
size 12 x 140).
SCREW IN SECURELY and after several hours' use tighten all the screws once again.