OLT6 and 1134 Description Installation and Turnup Guide
Page 27 of 50
8. Replace the Tellabs® cover if previously removed.
9. Route the power cable assembly up the rack side rail, dressing the cable as
needed.
10.Turn on the 48V Supply and the chassis should be ready for the next installation
step.