Slocum G2 Glider Operators Training Guide
Appendix B: Worksheets
40
TELEDYNE WEBB RESEARCH
Rev. 06/12
Glider Operations Mission Planning Overview
Worksheet
Glider number
Prepared by
Payload instruments
Deployment location
Surf temp
Surf sal
Density
Deployment date
Deployment notes
Science collection notes
Date
Tech
Notes
Ballast completed
Software checklist completed
Missions simulated
Dockserver tested and updated
Dockserver IP
Pre-seal checklist completed
Post-seal checklist completed
All supplies packed
Deployment details
Cruise leaves
Arrive on station
Recovery details
Cruise leaves
Emergency recovery plans