Slocum G2 Glider Operators Training Guide
Appendix B: Worksheets
42
TELEDYNE WEBB RESEARCH
Rev. 06/12
Pre-mission Seal Checklist (Final Seal)
All ballasting complete and weights adjusted; see the “Ballasting and H-moment” worksheet on
page 44.
Date
Tech
Notes
Fore
Pump lead screw clean and greased
Pitch lead screw clean and greased
Leak detect in place; batteries secured
Ballast bottles secured
O-ring inspected and lubed
Exterior nose/bellow clean of debris
Interior clean of debris
Reconstituted or fresh dessiccant installed
Payload
Science serial numbers
1
4
2
5
3
6
Wiring dressed
O-ring inspected and lubed
Payload weights properly secured
CF card fully seated and loaded
See software checklist (lab section)
Persistor button batteries checked
voltage
Interior clean of debris
Aft
Iridium SIM card installed
SIM number
Aft tray wiring dressed
CF card seated and loaded
See software checklist (lab section)
Persistor button batteries checked
voltage
Ballast bottle secured
O-ring inspected and lubed
Alkaline Battery voltages
Fore
voltage
Pitch
voltage
Battery voltage (emergency)
Anode to main tray continuity
Threaded rod clean and greased
Seal
O-rings clean of debris
15 in/lb torque
All sections snug together
Vacuum pulled