Post-seal Checklist
Slocum G2 Glider Operators Training Guide
TELEDYNE WEBB RESEARCH
43
Rev. 06/12
Post-seal Checklist
Date
Tech
Notes
General
Functional test procedure complete
Pick point installed
Wing rails installed
Wings and spareds packed
Hardware
Exterior connectors secure and fastened
Altimeter
Aanderaa (if present)
Burn wire
MS plug seated
Ejection weight assembly not seized
Pressure sensors clear and clean
Aft (flight)
Payload (science)
Bladder visual inspection
Cowling installed
Powered by battery
inside lab
Lab_mode_on
in/hg
+m_vacuum
(6 in/Hg 7 for 1000 m)
volt
Lab_mode_on Wiggle on
no errors for +5 minute
Verify time
Verify science
Put c_science_all_on 0 (off = -1)
Put c_science_on 3 (off = 1)
Put c_science_send_all 1 (off = 0)
Powered by battery
outside lab tests
3 hrs Argos
put c_argos_on 3 (off = 1)
Confirm receipt of messages at Argos
Confirm GPS
Confirm compass
Dockserver communications—send and receive
files
Run status.mi
Notes: