
SeaBat T-Series Subsea Operator's Manual
Page 95
January 31, 2019
Version 7
B.2
Installation Checklist
NOTE
This checklist only covers the most basic, standard system installation. Depending on the
system configuration or specific customer requirements, this list may or may not apply.
Follow these basic steps to install and configure your new SeaBat sonar system:
Install the wet-end components:
o
Transducer arrays
o
SSP
Install and connect cables:
o
Projector to SSP cable(s)
o
Receiver to SSP cable(s)
o
Auxiliary sensor cables
o
SSP to UUV cable
Power up the system
Test the system
For information on system configuration and operation, refer to the RESON Sonar UI User
Manual (
see Appendix E Reference Documentation
).
Содержание SeaBat T Series
Страница 6: ......