![Teledyne BDS 3000 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/teledyne/bds-3000/bds-3000_operating-instructions-manual_1080476034.webp)
Installation
BDS 3000
Teledyne Analytical Instruments
20
Figure 3-1: Model BDS 3000 Front Panel
All operator controls are mounted on the control panel, which is
hinged on the left edge and doubles as the door that provides access to
the sensor and cell block inside the instrument. The door is spring
loaded and will swing open when the button in the center of the latch
(upper right corner) is pressed all the way in with a narrow gauge tool
(less than 0.18 inch wide), such as a small hex wrench or screwdriver
Allow clearance for the door to open in a 90-degree arc of radius 7.125
inches. See Figure 3-2.
Figure 3-2: Required Front Door Clearance
Содержание BDS 3000
Страница 14: ......
Страница 30: ...Operational Theory BDS 3000 Teledyne Analytical Instruments 16 Figure 2 7 Electronic Component Location...
Страница 32: ...Operational Theory BDS 3000 Teledyne Analytical Instruments 18...
Страница 46: ...Installation BDS 3000 Teledyne Analytical Instruments 32...
Страница 49: ...Oxygen Analyzer Operation Teledyne Analytical Instruments 35 Figure 4 1 Hierarchy of Functions and Subfunctions...
Страница 76: ...Operation BDS 3000 Teledyne Analytical Instruments 62 Figure 4 2 Analyzer Power up Sequence...
Страница 77: ...Oxygen Analyzer Operation Teledyne Analytical Instruments 63 Figure 4 3 Analyzer Span Sequence...
Страница 78: ...Operation BDS 3000 Teledyne Analytical Instruments 64 Figure 4 4 Analyzer Zero Sequence...
Страница 86: ...Maintenance BDS 3000 Teledyne Analytical Instruments 72...
Страница 92: ...Appendix BDS 3000 Teledyne Analytical Instruments 78...
Страница 96: ...Appendix MSDS Teledyne Analytical Instruments 82...