Frontline Harmony Hardware & Software User Manual
48
Figure 4.2 – Import Bluetooth Launch Studio Document
The Event Viewer will show how many tests were imported and if there were any problems with some
of the tests in the list (for example having a test in the document that had been deleted in the TCRL and
no longer supported). (Figure 4.3)
Figure 4.3 – Event Viewer
4.2 Initiating Tests
4.2.1 Run Tests
1.
Selecting any number of tests makes the “Run Tests” button become available to click.
2.
Makes sure all connected equipment is powered and running.
3.
Once the desired tests are selected, click the “Run Tests” button to initiate. (Figure 4.4)
4.
Clicking the “Run Tests” button automatically saves the project.
Содержание FrontLine Harmony
Страница 1: ...Harmony Test System User Manual...
Страница 7: ...Frontline Harmony Hardware Software User Manual 7 Figure 1 1 Installed Applications Detected...
Страница 25: ...Frontline Harmony Hardware Software User Manual 25 Figure 3 5 IUT Information...
Страница 55: ...Frontline Harmony Hardware Software User Manual 55 Figure 5 4 Testing Summary...