background image

 

Frontline Harmony Hardware & Software User Manual 

25

 

 

Figure 3.5 – IUT Information 

 

 

 

Содержание FrontLine Harmony

Страница 1: ...Harmony Test System User Manual...

Страница 2: ...tered trademark of Teledyne LeCroy Inc The following are trademarks of Teledyne LeCroy Inc The Bluetooth SIG Inc owns the Bluetooth word mark and logos and any use of such marks by Teledyne LeCroy Inc...

Страница 3: ...onnecting Powering the Frontline Harmony 14 2 1 4 Launching the Software 19 Chapter 3 Configuration Settings 21 3 1 Configuring the Software 21 3 1 1 Project Settings 21 3 1 2 Tester and IUT Configura...

Страница 4: ...er 6 General Information 58 6 1 More Help 58 6 1 1 Frontline Software 58 6 1 2 User Assistance 58 Chapter 7 Regulatory 59 7 1 Certifications 59 7 1 1 FCC Federal Communications Commission 59 7 1 2 RED...

Страница 5: ...tware Chapter 3 Configuration Settings The software is configured to capture data Configuration settings may vary depending on the user s pc configuration and the implementation under test IUT Chapter...

Страница 6: ...ms configurations Operating System Windows 10 USB Port USB 2 0 High Speed or or later The Frontline software must operate on a computer with the following minimum characteristics Processor Core i5 pro...

Страница 7: ...Frontline Harmony Hardware Software User Manual 7 Figure 1 1 Installed Applications Detected...

Страница 8: ...up will appear and the pop up shown above will not be displayed during the installation of the Harmony software Figure 1 2 Harmony Premium Maintenance Status 1 3 Harmony Firmware The Harmony software...

Страница 9: ...rmware by going to Help Update Harmony Firmware If the Upgrade Firmware button or Downgrade Firmware button is clicked another popup window will open showing the progress of the firmware change Figure...

Страница 10: ...d the tests will not be run until the firmware is correct If the firmware was not changed when initially prompted one can change the firmware by going to Help Update Sodera Firmware If the Update Firm...

Страница 11: ...idation tests 2 1 Harmony Hardware 2 1 1 Attaching Cables for Conductive Operation Since over the air sniffing can be compromised in noisy RF environments conductive testing is the recommended approac...

Страница 12: ...the Antenna port of the Frontline Sodera hardware 5 Attach the last cable connected attenuator to the RF output of the IUT Important note If the IUT s RF output isn t capacitively coupled attach the...

Страница 13: ...though conductive testing will yield the best results over the air testing can provide good results when the testing is done in a controlled RF environment e g an RF shielded room If you choose to do...

Страница 14: ...Powering the Frontline Harmony Once you have readied the Harmony hardware for conductive or over the air testing the next step is to power up and connect the Frontline Harmony to the computer 1 Connec...

Страница 15: ...will illuminate Note The Harmony hardware is designed to operate using only USB power in mobile settings or when access to a wall outlet is unavailable Powering your Harmony hardware using a wall outl...

Страница 16: ...igure 2 6 PC Connection 4 Insert the other end of the USB cable into the PC 5 Insert the supplied USB mini cable into the Port 1 connection on the Frontline Harmony rear panel Figure 2 7 The second po...

Страница 17: ...te The Harmony Test System includes a Frontline Sodera unit Other Sodera units can be used with the Harmony hardware however they must have either a Dual Mode Advance license or a Single Mode LE Advan...

Страница 18: ...Frontline Harmony Hardware Software User Manual 18 8 After making these connections your setup should resemble a typical testing configuration Figure 2 9 Figure 2 9 Typical Testing Configuration...

Страница 19: ...the Software Installing the Frontline Harmony software creates folders necessary for the operation of the software After you ve placed the licenseKey py license key in the appropriate folder per sect...

Страница 20: ...T Configuration provides for configuration of Harmony hardware and IUT hardware f IXIT Data provides for Implementation eXtra Information for Test Implementation specific values that further describe...

Страница 21: ...e basic project settings Figure 3 1 Figure 3 1 Project Settings Configuration 1 Use the drop down box next to Max Number of Test Retries to the desired number The Harmony software allows 0 9 automatic...

Страница 22: ...saves the project files into the specified location If the specified folder does not already exist the Harmony software creates the folder 3 1 2 Tester and IUT Configuration Click the Tester and IUT C...

Страница 23: ...or the IUT to enable a connection to the IUT 6 Select the correct Baud Rate for the IUT 7 Select the correct Flow Control for the IUT 8 Select the preferred method for resetting the IUT between test c...

Страница 24: ...at may be required by certain Bluetooth SIG specified test cases Figure 3 4 Figure 3 4 IXIT Data 3 1 4 IUT Information Click the IUT Information tab to configure customer manufacturer and product meta...

Страница 25: ...Frontline Harmony Hardware Software User Manual 25 Figure 3 5 IUT Information...

Страница 26: ...rify that the IUT can generate a P 256 Public Private key pair and return the P 256 Public Key HCI AEN BV 07 C Verify that the IUT can generate a new Diffie Hellman Key HCI AEN BV 08 C Generate Debug...

Страница 27: ...Read Peer Resolvable Address Command Master HCI CM BV 02 C LE Read Local Resolvable Address Command Master HCI CM BV 03 C Verify that the IUT correctly handles the LE Read PHY Command HCI CM BV 04 C...

Страница 28: ...ring Fail Connection Setup LL CON ADV BV 01 C Accepting Connections LL CON ADV BV 02 C Accepting Connections Timeout LL CON ADV BV 03 C ADVERTISING MASTER Master Packets LL CON ADV BV 04 C Tests that...

Страница 29: ...3 C Tests that an initiator IUT sends a connection indication to an advertiser and after missing some reply transmissions from the slave still manages to setup a connection in the master role This tes...

Страница 30: ...e identity address when the identity address and an associated IRK are in the resolving list using device privacy mode LL CON INI BV 22 C Tests that an initiator IUT that only supports Channel Selecti...

Страница 31: ...rm the version exchange procedure LL CON MAS BV 22 C MASTER Master Acknowledgement Scheme LL CON MAS BV 23 C MASTER Responding to Feature Exchange LL CON MAS BV 24 C MASTER Initiating Connection Param...

Страница 32: ...CON MAS BV 52 C Test that a master IUT is able to receive data from a slave device when the slave is transitioning between 125kbit and 500kbit coded rates Confirm that IUT responds within the allowed...

Страница 33: ...LE 1M PHY LL CON MAS BV 75 C Verify that the IUT as Master correctly handles communication with a Lower Tester that does not support the Data Length Update Procedure LL CON MAS BV 76 C Verify that th...

Страница 34: ...Extreme Timings LL CON MAS BV 102 C Periodic Advertising Sync Transfer Procedure Accepting Synchronization Failure LL CON MAS BV 103 C Periodic Advertising Sync Transfer Procedure Accepting Different...

Страница 35: ...past LL CON SLA BV 02 C SLAVE Invalid CRC Anchor Point LL CON SLA BV 04 C Slave Sending Data LL CON SLA BV 05 C SLAVE Slave Receiving Data LL CON SLA BV 06 C SLAVE Slave Sending And Receiving Data LL...

Страница 36: ...Y change request LL CON SLA BV 45 C Test that a slave IUT terminates the Link Layer connection if the slave initiated PHY update procedure is not completed before the procedure response timer expires...

Страница 37: ...n Request Procedure IUT Initiated Periodic LL CON SLA BV 62 C Constant Tone Extension Request Procedure IUT Initiated Responses Disabled LL CON SLA BV 63 C Verifies that the IUT correctly handles the...

Страница 38: ...L CON SLA BV 88 C Periodic Advertising Sync Transfer Procedure Advertising IUT Initiated LL CON SLA BV 89 C Periodic Advertising Sync Transfer Procedure Advertising IUT Initiated LL CON SLA BV 90 C Pe...

Страница 39: ...LL CON SLA BV 120 C Sending Long Control PDUs after Feature Exchange LE Coded PHY LL CON SLA BV 121 C Unrequested Constant Tone Extension IUT Receiving AoD LE 2M PHY LL CON SLA BV 122 C Constant Tone...

Страница 40: ...with the correct payload fields timing and channel sequence for the maximum time allowed LL DDI ADV BV 26 C Extended Advertising Periodic Advertising LE 1M PHY LL DDI ADV BV 27 C Tests that an advert...

Страница 41: ...tisements with and without data along with chaining are tested Undirected and Directed events are tested LL DDI ADV BV 48 C Tests that an advertiser IUT using LE Coded PHY sends non connectable ADV_EX...

Страница 42: ...to the LT with a NRPA for the ScanA field LL DDI SCN BV 16 C Verify that the IUT when doing active scanning and using the RL reports the LT and sends SCAN_REQs to the LT with a RPA for the ScanA fiel...

Страница 43: ...Disabled LE Coded PHY LL DDI SCN BV 62 C Extended Scanning Multiple Sets Active Multiple PHYs All Supported PHYs Core 5 1 LL DDI SCN BV 63 C Privacy Extended Scanning Active Core 5 1 LL DDI SCN BV 64...

Страница 44: ...resolvable private address and that the address is refreshed LL SEC ADV BV 04 C Verify that an adv IUT is able to adv scan undir events using a NRPA LL SEC ADV BV 05 C Verify that an adv IUT is able t...

Страница 45: ...e LL SEC ADV BV 20 C Verify that the IUT when transmitting directed connectable advertising events connects in response to connect requests with the initiator identity address when the IUT has that ad...

Страница 46: ...LL SEC SLA BV 11 C Slave Sending REJECT_EXT_IND LL TIM ADV BV 01 C Test that an advertiser IUT responds to a scan request sent using the minimum timing between packets T_IFS 1 5 usec LL TIM ADV BV 02...

Страница 47: ...A BV 01 C Test that a slave IUT on accepting a parameter update from the master adopts a new anchor point when starting to use the new parameters LL TIM SLA BV 02 C Test that the slave IUT is able to...

Страница 48: ...est in the document that had been deleted in the TCRL and no longer supported Figure 4 3 Figure 4 3 Event Viewer 4 2 Initiating Tests 4 2 1 Run Tests 1 Selecting any number of tests makes the Run Test...

Страница 49: ...en all tests have completed or if the user clicks Stop Tests 8 If any selected test requires Sodera to complete the Frontline software will automatically be launched 4 2 2 Running Harmony Projects Una...

Страница 50: ...exe with the command line parameter runProject path_and_filename hprj Note the executable for running from command prompt is HarmonyAppConsole exe NOT HarmonyLeTester exe Example Figure 4 6 HarmonyApp...

Страница 51: ...ode will be 1 Chapter 5 Test Results In this chapter we describe on screen test results review previously run tests produce reports for submission to the Bluetooth SIG and describe how to access resul...

Страница 52: ...anual 52 Figure 5 1 Test Results Pane 3 Tests that are still running will indicate that status in the Verdict column Tests that have completed will be indicated by either a Pass Fail Inconclusive N A...

Страница 53: ...er Manual 53 Figure 5 2 Completed Tests 5 1 2 Review Previously Run Tests Previously run tests can be called up and reviewed at any time 1 Click the Run Explorer tab to access previously completed tes...

Страница 54: ...tomer s contact information d Manufacturer Details this section reports the manufacturer and the manufacturer s contact information e Product Details This section provides details about the product in...

Страница 55: ...Frontline Harmony Hardware Software User Manual 55 Figure 5 4 Testing Summary...

Страница 56: ...r in the location you specified see Section 3 1 1 when you initially saved the project The Results folder is automatically created when you save the project and the log and capture files created by th...

Страница 57: ...in the detail of each test and are therefore critical files They are accessed by the reporting function of the Harmony software Important files include a script log records the detail of the test case...

Страница 58: ...ntline Software where you can view the Bluetooth timeline check for 802 11 coexistence interference and view the decode level of any error uncovered by the process 2 To open a capture file open the Ca...

Страница 59: ...n which case the user will be required to correct the interference at his own expense 2 Changes or modifications not approved by the responsible party could void the user s authority to operate the eq...

Отзывы: