Dual-Feed 600A Load Center Frame
600CB10 & 600CB12 Installation Guide
5
© Telect, Inc. All rights reserved. 7.14.17 136429-2
509.926.6000 :: www.telect.com
2. Turn over the load center and check the jumper settings on the alarm board located on the underside of the chassis.
Refer to Figures 3 and 4. The jumpers are set up for REC-4 (non-mid-trip) circuit breakers and fuses. If you plan on
using RLS-4 mid-trip circuit breakers, change the jumper setting as indicated.
Figure 2 – Installing Load Straps
Figure 3 – Alarm Board Location
(Bottom View of Side A)