53
Start Up and Verification
Section
7
Start Up and Verification
This section provides information about the following topics:
•
Section
7.1 “Start Up”
•
Section
7.2 “Verifying the LED Status Indications”
Note
To learn about the IP address for your system or how to change it, refer to
Section
9.3
“Changing the 7800 Series Gateway Management Port IP Address” on page
62.
7.1
Start Up
1.
Connect to the web portal of the 7800-CTRL primary unit.
2.
Follow the web portal instructions to configure your unit as a primary unit in a new 7800 series
system.
3.
Before clicking the “yes, it is connected like that already” button, make sure that the physical
connections have been properly done.
4.
Connect to the web portal of the 7800-CTRL secondary unit.
5.
Follow the web portal instructions to configure your unit as a secondary unit in a new 7800 series
system.
6.
Before clicking the “yes, it is connected like that already” button, make sure that the physical
connections have been properly done.
Содержание 7800 N+1
Страница 1: ...Installation Guide 7800 Series Gateway November 3 2017...
Страница 8: ...TMG7800 Series System Installation Guide viii...
Страница 30: ...TMG7800 Series System Installation Guide 22...
Страница 52: ...TMG7800 Series System Installation Guide 44...
Страница 75: ...67 Appendix A Wiring Diagrams...