
To test cable margins
(WFM2300 only)
Stress loop connections for a monitored signal.
To test the cable margins for a
monitored signal, route the incoming signal input to one of the STRESS LOOP
connectors. Route a cable from the other connector of the STRESS LOOP to the
SDI A input as shown below.
Stress loop connections for a generated signal.
To test the cable margins for a
generated signal, route the SDI OUT signal to one of the STRESS LOOP
connectors. Route a cable from the other connector of the STRESS LOOP to your
video system as shown below.
Getting started
WFM2300 and WFM2200A Waveform Monitors User Manual
19
Содержание WFM2200A
Страница 2: ......
Страница 6: ......
Страница 16: ...Table of Contents x WFM2300 and WFM2200A Waveform Monitors User Manual ...
Страница 200: ...Functions 178 WFM2300 and WFM2200A Waveform Monitors User Manual ...
Страница 208: ...Software upgrades 186 WFM2300 and WFM2200A Waveform Monitors User Manual ...
Страница 242: ...ARIB content displays 220 WFM2300 and WFM2200A Waveform Monitors User Manual ...
Страница 252: ...Audio monitoring 230 WFM2300 and WFM2200A Waveform Monitors User Manual ...
Страница 270: ...Application examples 248 WFM2300 and WFM2200A Waveform Monitors User Manual ...