Examples
66
K1297-G20 Monitor User Manual
NOTE.
The data line has not been connected properly, if the following
message appears: “The initialization of PCM Check has been terminated!
The previous configuration will be loaded.” In this case, check the
connection between the Protocol Tester and the data line measuring
sockets.
If you get the message “No signalling detected on any ports”, please
restart the autoconfiguration. Start it now via the menu
Tools:
Autoconfiguration
.
Furthermore, take into account, that the autoconfiguration for LAP-based
protocols depends on the received data amount during a measurement
interval.
Содержание K1297-G20
Страница 4: ......
Страница 12: ...Service Safety Summary viii K1297 G20 Monitor User Manual...
Страница 100: ...Examples 88 K1297 G20 Monitor User Manual...
Страница 122: ...Appendix A Interfaces A 22 K1297 G20 Monitor User Manual Figure A 1 AP 4 AP 4 256 Board...
Страница 139: ...Appendix A Interfaces K1297 G20 Monitor User Manual A 39 Figure A 5 V X board...
Страница 149: ...Appendix A Interfaces K1297 G20 Monitor User Manual A 49 1 5 9 6 Figure A 6 E1 DS1 monitoring board PRIMO...
Страница 158: ...Appendix A Interfaces A 58 K1297 G20 Monitor User Manual...
Страница 170: ...Appendix B Keyboard B 12 K1297 G20 Monitor User Manual...
Страница 190: ...Appendix D Windows XPe Troubleshooting E 12 K1297 G20 Monitor User Manual...