Getting Started
K1297-G20 Monitor User Manual
23
Switching Off and Transporting the Device
Before you switch off the Protocol Tester, shut down the operating system,
and then switch off the Protocol Tester using the I/O switch.
K1297.
When folding the keyboard up, keyboard and cable box must be
connected and the cable must be completely inside the cable box.
1. First put the keyboard into the holding pins which are located at the top
of the monitor frame (a); then press the two locking buttons on the
cable box until you hear them click (b).
a.
b.
Use the optional transport case to transport the device over longer
distances.
Содержание K1297-G20
Страница 4: ......
Страница 12: ...Service Safety Summary viii K1297 G20 Monitor User Manual...
Страница 100: ...Examples 88 K1297 G20 Monitor User Manual...
Страница 122: ...Appendix A Interfaces A 22 K1297 G20 Monitor User Manual Figure A 1 AP 4 AP 4 256 Board...
Страница 139: ...Appendix A Interfaces K1297 G20 Monitor User Manual A 39 Figure A 5 V X board...
Страница 149: ...Appendix A Interfaces K1297 G20 Monitor User Manual A 49 1 5 9 6 Figure A 6 E1 DS1 monitoring board PRIMO...
Страница 158: ...Appendix A Interfaces A 58 K1297 G20 Monitor User Manual...
Страница 170: ...Appendix B Keyboard B 12 K1297 G20 Monitor User Manual...
Страница 190: ...Appendix D Windows XPe Troubleshooting E 12 K1297 G20 Monitor User Manual...