background image

 

 

 

VOT 2; Rev 1.2; EN; 09.07.2013  

 

TKT67C 

– Installation and maintenance 

 

 

6

 

3.5  List of optional features 

For more information on optional features, see Chapter 

8. Optional Features

 

TST6731 

Integrated Printer TKT67xxC 

TST6732 

 LCD Display Module TKT67xxC 

TST6741 

 Extra Charger Module (adds power taken from mains 3,000 VA)  
(1-2 pcs each 3,000 VA, Max each 180 Ah) TKT67xxC 

XWT6772 

 Switched-Maintained Package for 16 circuits each 350 W TKT6716C 

XWT6773 

 Switched-Maintained Package for 24 circuits each 350 W TKT6724C 

XWT6774 

 Switched-Maintained Package for 32 circuits each 350 W TKT6732C 

XWT6775 

 Switched-Maintained Package for 40 circuits each 350 W TKT6740C 

XWT6776 

 Switched-Maintained Package for 48 circuits each 350 W TKT6748C 

XWT6777 

 Switched-Maintained Package for 56 circuits each 350 W TKT6756C 

TST6751 

 IC Interface for 8 circuits each 350 W TKT6708C 

TST6752 

 IC Interface for 16 circuits each 350 W TKT6716C 

TST6753 

 IC Interface for 24 circuits each 350 W TKT6724C 

TST6754 

 IC Interface for 32 circuits each 350 W TKT6732C 

TST6755 

 IC Interface for 40 circuits each 350 W TKT6740C 

TST6756 

 IC Interface for 48 circuits each 350 W TKT6748C 

TST6757 

 IC Interface for 56 circuits each 350 W TKT6756C 

 

Central monitoring options: 

 

TST6722 

 LON Interface TKT67xxC 

TST6701 

 BACnet Interface TKT67xxC 

TST6721 

 ACM Interface TKT67xxC 

TST6724 

 WebCM/ WebACM Interface TKT67xxC 

TST1811E 

 BCM Interface TKT67xxC 

 

3.6  General description 

TKT67xxC(N) central battery unit is designed and manufactured according to the standards EN 50171 
and EN 60439-1. 

In normal situation, the central battery unit operates using a 230 V AC mains voltage, maintaining the 
battery charge level and supplying a voltage of 230 VAC to the maintained output circuits. If the mains 
voltage is interrupted or it drops below 180 V, the central battery unit switches to battery use. This 
connects a voltage of 220 VDC to the non-maintained circuits and the voltage supply to the maintained 
circuit switches from 230 VAC to 220 VDC. The battery supply is used as long as the mains voltage 
remains unavailable or the battery voltage has dropped to the deep discharge limit (173 V). 

In addition to the above mentioned standard functions, the control unit of the central battery unit also 
includes the following monitoring, testing and reporting functions: 

 

testing the luminaires either through addressable monitoring or by measuring the circuit 
current and by monitoring the condition of the batteries 

 

testing the capacity of the battery 

Содержание TKT6716C

Страница 1: ...VOT2 TKT67C TAPSA CONTROL CENTRAL BATTERY UNIT FOR EMERGENCY LIGHTING Installation and maintenance instructions Made In Finland...

Страница 2: ...5 1 Individual luminaire monitoring test with basic settings 11 4 5 2 Circuit monitoring luminaire test with basic settings 11 4 6 Operation of the central battery unit 12 4 7 Normal Status 12 4 8 Ce...

Страница 3: ...history 34 8 1 6 Error log 35 8 1 7 Setup 35 8 1 8 External USB connection 36 8 2 Printer 37 8 2 1 Language selection of the printer TKT67 CD or optional feature TST6731 37 8 2 2 Printing out test re...

Страница 4: ...ry unit de energized The central battery unit and the battery housing can be opened only by electrically skilled person Device must be made de energized before any maintenance or repair work Remove th...

Страница 5: ...Maximum number of circuits Input Voltage TKT6716C N 16 220 240 V AC 50 60Hz 3 TKT6724C N 24 220 240 V AC 50 60Hz 3 TKT6732C N 32 220 240 V AC 50 60Hz 3 TKT6740C N 40 220 240 V AC 50 60Hz 3 TKT6748C N...

Страница 6: ...T6757 IC Interface for 56 circuits each 350 W TKT6756C Central monitoring options TST6722 LON Interface TKT67xxC TST6701 BACnet Interface TKT67xxC TST6721 ACM Interface TKT67xxC TST6724 WebCM WebACM I...

Страница 7: ...wer supply cables A self learning system luminaires can be added or removed afterwards The central battery unit can be set for either addressable monitoring of the luminaires or for circuit monitoring...

Страница 8: ...rcuit Max 11 200VA 1 h 11 200 W 18x65 Ah 3 h 11 200 W 18x65 Ah TKT6740C N 5x 8x350W 4x700W 2x1 400W or 2 5A circuit Max 14 000VA 1 h 14 000 W 18x65 Ah 3 h 14 000 W 18x65 Ah TKT6748C N 6x 8x350W 4x700W...

Страница 9: ...0272 2 2001 Safety requirements for secondary battery installations Part 2 Stationary batteries EN 60439 1 A1 2005 Distribution units Part 1 Requirements for type tested and partly type tested units I...

Страница 10: ...switch selector that defines the characteristic of the board The functions of the DIP switches are DIPs 1 3 give the board its internal address DIP 4 defines whether the board uses addressable centra...

Страница 11: ...gs and 4 11 Buttons 4 5 1 Individual luminaire monitoring test with basic settings As a basic setting the luminaire test is done automatically once a day at a predetermined time The central battery un...

Страница 12: ...The menu functions of LEDs 1 and 2 are so called basic functions All other functions are related to the settings of the central battery unit The latter do not need to be changed in normal use When the...

Страница 13: ...n Battery fault and Internal fault LEDs are also lit Battery charger is charging batteries with too high voltage Charger is faulty and it must be changed and or Batteries are at the end of their lifet...

Страница 14: ...D can be lit with other LEDs that indicate the fault more specifically If the battery is disconnected the charger doesn t charge the battery fuse is blown or the battery doesn t accept charging curren...

Страница 15: ...aire is faulty f the LED is not lit no luminaire has been assigned for that address Circuit monitoring The LED bars display the total input power of the circuit If the LED or LEDs are flashing during...

Страница 16: ...ue you wish to select shows in the display For example 6 Interrupt the battery test 4 Acknowledge by pressing the MENU OK button again The required action begins 3 SETUP Use this option to enable disa...

Страница 17: ...ber of days If the number is 1 the test is made every day or if it is 7 the test is done once a week The number of the second segment determines the settings of the luminaire tests 0 Luminaire and bat...

Страница 18: ...e changed all the way up to 150 mA In the display this shows as the value 30 When the value 30 is exceeded the following value is the minimum current the change of which the central battery unit notic...

Страница 19: ...ked to a specific central battery unit if there are more than one central battery units in the building To set an individual number for the unit 1 Go to the menu with the MENU OK button 2 Press the BR...

Страница 20: ...o set the system time and date 1 Go to the menu with the MENU OK button 2 Press the BROWSE button until the right led is lit 3 Press the SET button until the value you wish to select shows in the disp...

Страница 21: ...o action needed unless the test fails If the test fails check condition of batteries To run the battery test yourself either 1 Press the BROWSE button for 8 seconds or 1 Press the MENU OK button 2 Use...

Страница 22: ...ctors 68 69 FUSE FAULT If the LED is lit there is a faulty fuse in the control module If the LED is blinking slowly there is a faulty fuse in the circuit shown on the display If the LED is blinking qu...

Страница 23: ...aire test Press for 8 seconds to start battery test V METER 1 second until the indicator LED is lit Press and hold SET for 1 second the voltage of the battery is displayed in the LCD display DC A METE...

Страница 24: ...the usage of any emergency luminaires operating on AC DC voltage However in case of the fluorescent lamp luminaires they shall be designed so that they switch off when the lamp fails This is because t...

Страница 25: ...ed as maintained exit luminaire or Local Controller If you wish to change into non maintained emergency luminaire circuits the Mode link needs to be removed from those circuits Layout for Mode links i...

Страница 26: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 26 5 2 1 Parts layout...

Страница 27: ...onnection wiring for circuit board 1 1 400 W 4 circuits combined parallel connection wiring for circuit board 1 Note If you are using parallel connections please note that all output circuits in same...

Страница 28: ...ircuit board operates according to the addressable luminaire monitoring principle When the DIP switch number 4 is in the ON position the circuit board operates according to the circuit monitoring prin...

Страница 29: ...capacity The charging current has been set to minimum at the factory The battery type and capacity must be set checked as follows 1 Set the battery type and capacity with the recharge control unit DI...

Страница 30: ...s flashing Checking luminaire circuits on at a time is running As the checking process progresses the LEDs will show the luminaires found in the circuit or the total input power of the circuit Once th...

Страница 31: ...required for the central battery unit other than changing the batteries when the specified emergency mode duration is no longer achieved The luminaires need to have their light sources replaced once...

Страница 32: ...central battery unit depending on the model You can either select a central battery unit that already includes the option or select the option as an added feature depending on the model The options ar...

Страница 33: ...s Figure 2 LCD after having received configuration data from the central battery system 8 1 3 LCD menu tree When you press the SETUP button the LCD menu tree is displayed You can browse the menu by pr...

Страница 34: ...er board first select the board using the buttons then confirm your selection by pressing the SETUP button To move back to the higher level menu from the test log press the SETUP button for 1 5 s You...

Страница 35: ...test log press the SETUP button 8 1 7 Setup You can change the settings and start tests by first selecting the desired function using the buttons and then confirming your selection by pressing the SE...

Страница 36: ...llowing display is shown Figure 11 USB cable connected The LCD software will scan the USB ports opening a connection A new row will appear on the display informing you that a connection has been opene...

Страница 37: ...ter TKT67 CD or optional feature TST6731 It is a possible to switch the language of the printing with the DIP switches of the TST3004 unit The TST3004 contains the pre programmed languages English Fin...

Страница 38: ...DISCHARGE CURR 01 20A Current of all circuits in battery use BATT VOLTAGE 249V Voltage of battery on time of printing LUMINAIRE TEST OK 00 00 00 Result and date of last luminaire test BATTERY TEST OK...

Страница 39: ...matically reset when the fuse has been replaced with a new one The condition of the output circuits is checked only before the tests The circuit voltages are checked at this time with an open and clos...

Страница 40: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 40 APPENDIX 3 Connection alternatives for batteries...

Страница 41: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 41 APPENDIX 4 Circuit diagram with 3 phase input...

Страница 42: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 42...

Страница 43: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 43...

Страница 44: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 44...

Страница 45: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 45...

Страница 46: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 46...

Страница 47: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 47...

Страница 48: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 48...

Страница 49: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 49...

Страница 50: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 50...

Страница 51: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 51...

Страница 52: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 52...

Страница 53: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 53...

Страница 54: ...re test automatically battery test manually luminaire test manually battery test automatically 6 Sensitivity 7 Luminaire test time 8 Delay time 9 Cent Number 10 Battery level 11 Duration 12 Years 13 M...

Страница 55: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 55...

Страница 56: ...t teknoware fi www teknoware fi Emergency lighting unit Telephone Email emexit teknoware fi Export Manager Mr Simo Kurki 358 0 3 883 178 simo kurki teknoware fi Area Manager Mr Pasi Hongisto 358 0 3 8...

Отзывы: