Section:
Date: Jan 2020
CEREBRO, ELECTRICS FOR IC
Page: 9 of 12
COM_601
3.1.7.8
3.1.8
3.1.9
Channel 3
Channel 4
NOTE: Make sure
that the dongle is
connected to the
Control Box.
3.1.11
3.1.10
6
NOTE: Connect the cables to the control box by connecting the Monitor Arms (YMSZ) to Channel 3 and connecting the remaining cables for YCH to the appropriate Channels (1 & 4) as shown
above. The channels are identified by moulded in numbers on the control box housing. For more information, refer to the programming sequence guide.
CABLE MANAGEMENT & PROGRAMMING FOR CEREBRO