Teka POWER PIPE II SYSTEM Скачать руководство пользователя страница 3

POWER PIPE II™ SYSTEM

Installation

RELEASE DATE

9-13-17

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF TEKA ILLUMINATION AND ITS RECEIPT OR POSSESSION DOES NOT CONVEY ANY RIGHTS TO REPRODUCE, DISCLOSE ITS CONTENTS, OR TO MANUFACTURE, USE OR SELL ANYTHING 

IT MAY DESCRIBE.  REPRODUCTION, DISCLOSURE OR USE WITHOUT SPECIFIC WRITTEN AUTHORIZATION OF TEKA ILLUMINATION IS STRICTLY FORBIDDEN.

DRAWING

 

NUMBER

INS-2656-00

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

Finished grade

Pea gravel or sand

Finished grade

Finished grade

Stability Flange

Pea gravel or sand

Finished grade

Pea gravel 

or sand

Above Ground   

Installation                 

Pea gravel 

or sand

Concrete               

Pea gravel 

or sand

Pea gravel 

or sand

Pea gravel 

or sand

Concrete

Below Ground 

Installation

Pea gravel 

or sand

3.  Slide Stability Flange onto Power Pipe II™.  Use 

Stability Flange to aid in installation of Power 

Pipe II™.

2.  Excavate trench according to designed lighting 

plan. Dig hole a minimum of 24” deep and 10” 

wide to accommodate Power Pipe II™ at desired 

fixture locations.  

1.  Determine Soil Type by referencing DIG-IT Guide. 

Prep soil according to DIG-IT Guide.

Finished grade

Pea gravel or sand

Finished grade

Finished grade

Stability Flange

Pea gravel or sand

Finished grade

Pea gravel 

or sand

Above Ground   

Installation                 

Pea gravel 

or sand

Concrete               

Pea gravel 

or sand

Pea gravel 

or sand

Pea gravel 

or sand

Concrete

Below Ground 

Installation

Pea gravel 

or sand

4.  Pull low voltage wiring from remote driver to 

Power Pipe II™. Allow for additional cable to 

make connections to fixture leads and future 

service. Place Power Pipe II™ in hole.  

Finished grade

Pea gravel or sand

Finished grade

Finished grade

Stability Flange

Pea gravel or sand

Finished grade

Pea gravel 

or sand

Above Ground   

Installation                 

Pea gravel 

or sand

Concrete               

Pea gravel 

or sand

Pea gravel 

or sand

Pea gravel 

or sand

Concrete

Below Ground 

Installation

Pea gravel 

or sand

5.  Back fill with pea gravel or sand prior to pour. 

Finished grade

Pea gravel or sand

Finished grade

Finished grade

Stability Flange

Pea gravel or sand

Finished grade

Pea gravel 

or sand

Above Ground   

Installation                 

Pea gravel 

or sand

Concrete               

Pea gravel 

or sand

Pea gravel 

or sand

Pea gravel 

or sand

Concrete

Below Ground 

Installation

Pea gravel 

or sand

6.  Pour concrete (By Others).

 Label on Power Pipe II™ indicates 

installation depth with finished grade.

7.  Make waterproof connections from branch 

circuit wiring to integral driver primary 

side using waterproof wire connectors. 

Connect incoming ground wire to 

green fixture wire. 

See wiring diagram. 

 

WIRING DIAGRAM 

120V

COM

GROUND

WIRING DIAGRAM

Driver

GROUND FROM FIXTURE

120V

+

Fixture

COM

GROUND

Driver

-

GROUND IN T-HOUSING

120V

COM

 

All line voltage connections must be made 

in accordance to NEC standards.

8.  Insert wires and connectors into Power Pipe II™. 

Place fixture and cap on Power Pipe II™. 

9.  Tighten three (3) Phillips screws using a Phillips 

screwdriver.

DRIVER HOUSING MUST BE INSTALLED ABOVE GRADE. POWER PIPE™ IS LABELED AT GRADE LEVEL.

DRIVER HOUSING INSTALLED BELOW GRADE WILL VOID WARRANTY

Stake Integral Driver Installation

   Failure to use waterproof wire connectors 

will cause fixture to fail and VOID PRODUCT  

WARRANTY.

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.tekaillumination.com • [email protected]

Содержание POWER PIPE II SYSTEM

Страница 1: ...vincial Codes Follow product label information and instructions Qualified Personnel with appropriate personal protective equipment must perform all servicing of this product Before wiring to power sup...

Страница 2: ...d grade Pea gravel or sand Concrete or Dirt Finished grade Finished grade Pea gravel or sand Concrete or Dirt Finished grade Finished grade Pea gravel or san Concrete or Dirt Finished grade WIRING DIA...

Страница 3: ...fixture leads and future service Place Power Pipe II in hole Pea gravel or sand Finished grade Finished grade Stability Flange Pea gravel or sand Finished grade Pea gravel or sand Above Ground Install...

Страница 4: ...PORTANT SAFETY INFORMATION READ FOLLOW AND SAVE THESE INSTALLATION INSTRUCTIONS Product must be installed by a qualified person in a manner consistent with its intended use and in compliance with the...

Страница 5: ...k fill with pea gravel or sand prior to pour Pea gravel or sand Concrete or Dirt Finished grade 7 Pour concrete By Others Label on Power Pipe indicates installation depth with finished grade 5 Connect...

Страница 6: ...fill with pea gravel or sand prior to pour de Pea gravel or sand Finished grade Finished grade Stability Flange Pea gravel or sand Finished grade 6 Pour concrete By Others Label on Power Pipe indicat...

Страница 7: ...off and lock out power at fuse or circuit breaker before service The use of accessory equipment not recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition...

Страница 8: ...leads using waterproof wire connectors By Others See wiring diagram Standard Fixture Installation Aiming 1 To aim vertically loosen the lamp head adjustment screw using a 5 32 Allen wrench adjust as n...

Страница 9: ...Remove optic by pulling gently and lift up 4 Use 050 Allen wrench to loosen three 3 set screws holding optic holder and LED module 6 Replace optic by lining tabs with optic holder then pressing down...