![Tecnosens NCL C10 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/tecnosens/ncl-c10/ncl-c10_assembly-instructions-manual_1072052024.webp)
4. Activation and Maintenance of the Sensor
20
4.4
P
UT THE
P
ROBE OUT OF
S
ERVICE
To ensure that the probe functions properly after a long period of inactivity, the
following procedure must be strictly followed:
1)
Disconnect the sensor from any electrical connection.
2)
Depressurize the probe holder.
3)
Loosen the tightening nut of the probe holder.
4)
Slowly extract the sensor from the probe holder.
5)
Unscrew and remove the cap.
6)
Rinse the electrodes with a jet of warm water, leaving no residue. Do
not touch the electrodes with your fingers.
7)
Leave the cap and the probe to dry, in a place protected from dust. Do
not use air jets.
8)
To protect the electrodes during storage, screw the cap to the probe
without tightening.
9)
To protect the sensor, keep it in its specific box.
I
NSTALLATION
I
NSTRUCTIONS
Before reactivating a probe that has been taken out of service for a long
time, it is recommended to replace the cap with a new one.
I
NSTALLATION
I
NSTRUCTIONS
Observe the regulations and legal dispositions currently in force for
disposal.
I
NSTALLATION
I
NSTRUCTIONS
TECNOSENS s.r.l. takes delivery only of sensors suitably separated from
contaminating chemical elements to proceed with disposal.
Содержание NCL C10
Страница 2: ...VIA FRANCESCO ANTOLISEI 25 00173 ROME ITALY 39 06 4576 3210 www tsens biz info tsens eu ...
Страница 4: ......
Страница 8: ...1 Introduction 4 Figure 2 version with voltage output standard supply ...
Страница 31: ...7 Notes 27 7 NOTES ...
Страница 32: ...VIA FRANCESCO ANTOLISEI 25 00173 ROME ITALY 39 06 4576 3210 www tsens biz info tsens eu ...