70
DXBA408
Rev_14
15 – STANDARD STERILIZATION PROCEDURE
Sterilization means adopting precise operational protocol and applying a system.
Autoclave is the final link of this system.
Those who do not follow all of the various phases of the sterilization system will be unsatisfied with the final
result.
TECNO-GAZ SpA produces all the devices for each phase of the sterilization cycle.
Therefore it is necessary to:
1 - Prepare a precise written operational protocol to distribute to all operators assigned to sterilization.
TECNO-GAZ can provide these personalized protocols.
2 -
Follow carefully and with attention all of the sterilization cycle phases:
DISINFECTION obligatory phase, in base of that is obligatory for the operator security, to be done with
immersion in chemical liquids or thermo-disinfection.
Ref. TECNO GAZ - vasche mod. artica – termodisinfettore mod. aqua
CLEANSING the most important phase which insures the removal of all types of residual, chemical
and organic. The most suitable instruments are ultrasound baths.
Ref. TECNO GAZ – ultrasound mod. tecna
DRYING essential phase to avoid corrosion of instruments and interference of the sterilization cycle.
Ref. TECNO GAZ – device mod .unika
PACKAGING essential phase for maintaining sterile the treated instruments.
Ref. TECNO GAZ – sealer mod .opera
STERILIZATION final phase of steam sterilization
Ref. TECNO GAZ –autoclave mod. europa b xp
Содержание Europa B xp
Страница 31: ...31 DXBA408 Rev_14 SCHEMA DI COLLEGAMENTO DEL DEMINERALIZZATORE VALIDO FINO AL 11 05...
Страница 32: ...32 DXBA408 Rev_14 SCHEMA DI COLLEGAMENTO DEL DEMINERALIZZATORE VALIDO DAL 12 05...
Страница 67: ...67 DXBA408 Rev_14 CHEME OF CONNECTION OF THE VALID DEMINERALIZER UNTIL THE 11 05...
Страница 68: ...68 DXBA408 Rev_14 SCHEME OF CONNECTION OF THE VALID DEMINERALIZER FROM THE 12 05...
Страница 104: ...104 DXBA408 Rev_14 SCHEMA DE BRANCHEMENT DU DEIONISATEUR VALIDE JUSQU AU 11 05...
Страница 105: ...105 DXBA408 Rev_14 SCHEMA DE BRANCHEMENT DU DEIONISATEUR VALIDE DU 12 05...
Страница 141: ...141 DXBA408 Rev_14 ESQUEMA DE ENLACES DEL DESMINERALIZADOR V LIDO HASTA EL 11 05...
Страница 142: ...142 DXBA408 Rev_14 ESQUEMA DE ENLACES DEL DESMINERALIZADOR V LIDO DEL 12 05...
Страница 178: ...178 DXBA408 Rev_14 ANSCHLUSSCHEMA DES G LTIGEN ENTZSALZERS BIS DAS 11 05...
Страница 179: ...179 DXBA408 Rev_14 ANSCHLUSSCHEMA DES G LTIGEN ENTZSALZERS VOM 12 05...