
82
Connections of “Main treatment unit” to the “Additional treatment unit” by piping (valves, pipe size):
Correct sizing of level sensor(s) in the sewage collection tank(s):
Correct positioning of the anti-siphon valves:
Sewage filling line (at least 20/30 cm above the maximum level of the collecting tank 1):
Sewage filling line (at least 20/30 cm above the maximum level of the collecting tank 2, if present):
Sea water filling line (at least 20/30 cm above the sea water line):
Out-board discharge line (at least 20/30 cm above the sea water line, if above s.w.l.):
Connections to the air relief outlet piping (valves, pipe size):
No obstructions in the line of air relief (presence of filters-not authorized by Tecnicomar:
YES
NO)
Chemical products, properly stored, having adequate chemical and physical characteristics.
ELECTRICAL CONNECTIONS
Grounding -
Presence of electromagnetic interference -
Circuit breaker
else: ______________________________________________________________________________
Correct wiring position at control box according to the Main power supply (voltage):
Correct wiring position at seawater pump according to the power supply (voltage):
Correct wiring position at seawater inlet device (if supplied) according to the power supply (voltage):
Correct wiring position at “filling pump 1” according to the power supply (voltage):
Correct wiring position at “filling pump 2” according to the power supply (voltage):
Correct wiring position at H
2
O
2
dosing system according to the power supply (voltage):
Correct wiring position at ECOFLOC dosing system according to the power supply (voltage):
Correct wiring position at “sludge discharge valve (V2)” according to the wiring connections:
Correct wiring position at “UV Sterilizer” according to the wiring connections (voltage):
Correct wiring position at “level probe(s)” according to the wiring connections (voltage):
Correct wiring position at “level probe(s) control box(es)” according to the wiring connections (voltage):
Correct wiring position at “Remote control” according to the wiring connections (voltage):
Correct wiring position at “sludge tank sensor” to STP control box according to the wiring connections:
Содержание ECOmar 145 S
Страница 45: ...45 12 1 1 Macerating Discharge pumps performance curves Fig 12 1 1 1 C30 50Hz performances ECOmar 20 32 S ...
Страница 46: ...46 Fig 12 1 1 2 C30 60Hz performances ECOmar 20 32 S ...
Страница 47: ...47 Fig 12 1 1 3 S42 50Hz performances ECOmar 45 70 145 S ...
Страница 48: ...48 Fig 12 1 1 4 S42 60Hz performances ECOmar 45 70 145 S ...
Страница 79: ...79 ...