CSB CryoEM Facility TF20 Operating Instructions SEC
05/02/16
9.
Fill the liquid nitrogen dewar. You'll need to fill it 2x initially. The first time a lot of LN2 will quickly
boil off. Wait 1015 mins after initial fill up and then top off. This should last ~4hrs. In total, for an
8hr work day, you'll need to fill the anticontaminator 3x.
Check every 24 hours
and add nitrogen
as needed.
10.
If all these conditions are met, you are OK to proceed.