Before  using  the  ice  cream  machine,  water 

and power sources need to be supplied. 

 

7.1 Power supply 

        Firstly customer is suggested to have a 

professional socket which has earth line. Yellow 

green line is earth line. 

 

7.2 Check the rotation direction of motor   

Ice cream machinery motor has two rotations, 

clockwise and counterclockwise. It is embodied in 

the mixing components. When wiring, please make 

sure the button on the control panel points in same 

direction with rotation. Otherwise, it will affect the 

cooling effect and discharging speed. 

 

7.3 After connected power supply, should first test 

motor  steering  is  correct,  if  in  the  opposite 

direction, should be adjust the socket or attachment 

position,  until  the  steering  and  motor  signs  in  the 

same direction. 

 

7.4 Before switch on the ice cream machine, make 

sure that no packaging pieces, and other impurities 

in ice cream machine 

The  machine should be thoroughly  cleaned before 

use. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Before  starting  any  maintenance  work  or 

operator checks, you must: 

 

Verify  that  the  ice  cream  Vertical  Batch 

Freezer  is  turned  off  and  it  is  disconnected 

from the power mains. 

 

Set up a sing indicating the work that is being 

done. 

 

If  necessary,  procure  adequate  lifting 

equipment. 

 

Verify that the operations to be done will not 

injure person or damage machinery nearby. 

 

8.1 CLASSIFICATION OF INTERNVENTIONS

   

Maintenance work falls into two categories

 

      Normal maintenance: 

defined as maintenance 

work to the ice cream Vertical Batch Freezer under 

normal operating conditions, i.e. without requiring 

the replacement of any parts. This includes: 

 

        Maintenance  within  a  few  hours  before  the 

operation  

        Weekly maintenance work 

        Work done every six months 

        Work done annually 

 

Extraordinary maintenance:   

      Defined as work comprising: 

      Work required due to malfunction 

      Work  to  be  done  at  long  intervals,  i.e.  work 

corresponding  to  the  end  of  the  work  of  a  main 

part  and  requiring  the  interruption  of  display  case 

operation. 

 

8.2  REQUIREMENTS  FOR  MAINTENANCE 

PERSONNEL   

        Maintenance  must  be conducted SOLELY  by 

qualified  personnel  specializing  in  working  with 

refrigerating systems. 

The  must  know  and  understand  the  written 

7  Installation  and  use  of  ice  cream 
Vertical Batch Freezer 

8 Maintenance 

 

Содержание IC3

Страница 1: ... VERTICAL BATCH FREEZER INSTRUCTION MANUAL IC3 Sincerely thank you for choosing our machine Please read the manual carefully before operate When finish reading please properly keep manual and warranty card English ...

Страница 2: ...nual Always refer to the manual before carrying out any operation Safeguard this manual and make sure it is always available next to the machine or nearby The diagrams and drawings are furnished by example In pursuance to its policy of constant development and updating The manufacturer may make any changes without giving advance notice This manual must be kept for the entire life of the machine If...

Страница 3: ...VERTICAL BATCH FREEZE P3 5 INVISIONED USE P4 5 6 POSITIONING P5 7 INSTALLATION AND USE OF THE ICE CREAM VERTICAL BATCH FREEZER P6 8 MAINTENANCE P6 7 9 TROUBLESHOOTING P8 10 DISMANTLING P8 11 CUSTOMER FILE CARD P9 12 CONTACT US P10 ATTENTION The content such as shape material and color can be changed without prior notice because of products continuously improved INDEX ...

Страница 4: ...gredients Flexible and removable agitator blade that touch very well the cylinder to mix the ice cream perfectly 1 4 Microcomputer control system digital display easy to operate 1 5 Direction wheels with brake for easy moving 2 TECHNICAL DATE Ice Cream Machine Range IC3 External Dimension L W H mm 547 552 430 Max Amount Per Batch Liter 2 Working Cycle min 15 20 Hourly Production Liter Hour 6 8 Ref...

Страница 5: ... which they were originally placed by the respective manufacturers 3 1 INTENDED USER OF THE INSTRUCTION MANUAL This instructions manual is intended for the following personnel shipping loading and unloading staff operators installers maintenance personnel 3 2 OBJECTIVES OF THE INFORMATION IN THE MANUAL The purpose of this manual is to indicate how the machine should be used based used design It wi...

Страница 6: ...of the report to the manufacture or area representative 4 4 PACKING MANAGEMENT All the unpacked materials can be recycled in order to dispose of according local legalization Be sure to destroy plastic components to prevent any hazards suffocation to children 4 5 PERSONNEL REQUIREMENTS We recommend that the operations to move the ice cream Vertical Batch Freezer should be handled by personnel accus...

Страница 7: ...roperly trained before operating the machine Please read the instruction manual carefully before using the machine Operating without complying with the use regulations might case the occurrence of accident Accurate installation of all the components and accessories must be ensured and verified feasible for the proper use of the ice cream Vertical Batch Freezer 5 3 COMPONENTS INTRODUCE Condenser un...

Страница 8: ...fications that may be needed 6 1 Make sure that ice cream is put on the desktop Horizontal 6 2 Make sure the normal heat radiation of the ice cream Vertical Batch Freezer nothing is to be placed in front of the heat discharge panel side panel No things Side back panel No things These two methods are prohibited discharge Furthermore please NEVER place the ice cream Vertical Batch Freezer at Door Wi...

Страница 9: ...erify that the ice cream Vertical Batch Freezer is turned off and it is disconnected from the power mains Set up a sing indicating the work that is being done If necessary procure adequate lifting equipment Verify that the operations to be done will not injure person or damage machinery nearby 8 1 CLASSIFICATION OF INTERNVENTIONS Maintenance work falls into two categories Normal maintenance define...

Страница 10: ...OOSE ENDS 8 4 Cleaning the ice cream machine It is necessary to clean the barrel before and after operating the machine Furthermore the barrel must be properly cleaned up with warm water after being disinfected As shown in the picture below every time before or after making ice cream the mixed part of the machine must be screwed off and disinfected properly so that to ensure the quality of ice cre...

Страница 11: ...re to separate and identify mark all the components 10 2 5 Perfect organization during disassembly guarantees perfect and safe reassembly 10 2 6 All the material must be kept in a dry area that is protected against weather 10 2 7 Before remounting the machine check the material thoroughly for any damage FAULT CAUSE SOLUTIONS No supply voltage Main switch OFF Plug not connected Product exceeds load...

Страница 12: ...you to fill in the following Product Name Product Type Ex work Code Purchase Date Usage unit Detailed address Telephone Fax Postal code Contact Tel Besides the document accompanied the machine if you need Further detailed technical data The latest product information Other product detailed information Your opinions The characteristic of the product All service after sale Others Warranty time start...

Страница 13: ...081119 E email easybestchina qdtecmach com fax 86 0532 89081177 79 Http www easybest tecmach com hotline 86 0532 89089202 Http www easybest tecmach cn Due to the continuous improvement of the product the type shape material and color of the album are subject to change without notice ...

Страница 14: ...11 ...

Отзывы: