Supplement Airplane Maintenance Manual
Cessna 172 with TAE 125-02-99 / -114
AMM-20-02
Chapter:
Issue:
Issue Date:
Page:
Content:
20-AMM-05-02
3
06.11.2013
4
8
Rev. No:
Rev. Date:
1
25.08.2014
Every 500 operating hours
•
Work as described for every 100 operating hours
•
Inspect main battery and excitation battery, servicing the
batteries (refer to Chapter 24, Section 24.30, Maintenance
Practices)
Every 800 operating hours
•
Work as described for every 200 operating hours
•
Further maintenance action according to Operation and
Maintenance Manual OM-02-02
Every 1000 operating hours
•
Work as described for every 200 operating hours
•
Work as described for every 500 operating hours
•
Further maintenance action according to Operation and
Maintenance Manual OM-02-02
Every 1200 operating hours
•
Work as described for every 200 operating hours
•
Work as described for every 300 operating hours
•
Replace the turbocharger clamp (refer to Chapter 71,
Section 71.60, Maintenance Practices) (TAE 125-02-114
only)
•
Further maintenance action according to Operation and
Maintenance Manual OM-02-02
Every 1500 operating hours (TAE 125-02-99)
•
Work as described for every 300 operating hours
•
Work as described for every 500 operating hours
•
Replace the turbocharger clamp (refer to Chapter 71,
Section 71.60, Maintenance Practices)
•
Further maintenance action according to Operation and
Maintenance Manual OM-02-02
Every 3000 operating hours
•
Replace silicate cartridge of the expansion tank (refer to
Chapter 75, Section 75.00, Maintenance Practices).
Carry out maintenance action in reference to the 6 years
limit; whichever occurs first.
Note:
Apply Service Letter SL TAE 601-1001 if necessary.
Содержание Cessna 172
Страница 8: ......