Supplement Airplane Maintenance Manual
Cessna 172 with TAE 125-02-99 / -114
AMM-20-02
Rev. No:
Rev. Date:
Chapter:
Issue:
Issue Date:
Page:
Content:
20-AMM-75-02
3
06.11.2013
7
18
1
25.08.2014
B.
Installation of the new gearbox
(1)
Attach the new gearbox. For installation
procedures please refer to RM-02-02.
(2)
Mount the new bracket to the gearbox using two
hexagon screws M6x12 and two of the original
washers.
(3)
Use edge protection for the bracket.
Figure 7
(4)
Reattach the fuel line using the original mounting
parts.
(5)
Mount the hose between intake manifold and oil/
water heat exchanger using two hose clamps.
See Figure 8.
(6)
Attach the hose to the gearbox using a clamp, a
hexagon screw M6x12 and a washer (M6).
See Figure 8.
Содержание Cessna 172
Страница 8: ......