3
Assembly of two-wheeled steam train
1.1Assembly of battery
1.Boiler assembly
1
095
Just tighten 095 to half the
full engagement depth
and then install 114
017
003
114
016
1.2 Assembly of circuit board
016
095
Plug the battery
plug in the
circuit board
Circuit board
identification diagram
Important note: before assembly, find
the bottled lubricating oil, be sure to
put enough oil in all the places that
need to be lubricated, otherwise the
machine is easy to get stuck
Position indicator
for lubricating oil
TECHING
R
Содержание DM21
Страница 1: ......
Страница 2: ...3 R...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Precautions...
Страница 7: ......
Страница 9: ......
Страница 15: ...6 095 037 3 1 Installation of small flue 3 Main body 2 5 Assembly of water tank assembly TECHING R...
Страница 18: ...9 095 095 015 014 005 028 3 6 Assemble the driving cab TECHING R...
Страница 35: ...26 105 053 053 033 115 053 095 026 7 Assembly of cab chassis The counterbore faces upwards TECHING R...
Страница 36: ...27 095 012 095 020 011 The side with the wide notch faces upwards TECHING R...
Страница 38: ...29 115 082 079 045 106 TECHING R Lubricant 1 positions...
Страница 41: ...32 098 098 TECHING R...
Страница 42: ...33 Note Insert 089 into the hole in 056 and then mount the screws below 095 TECHING R...
Страница 43: ...34 Flue front cover plate assembly 095 TECHING R...
Страница 44: ...35 Front shock absorber assembly 098 TECHING R...
Страница 45: ...36 Cab assembly 095 095 TECHING R...
Страница 47: ...38 Assembly of two wheeled steam train completed TECHING R...
Страница 53: ...44 Assembly completed Must pay attention to the directions of the magnet 111 and the locomotive1 TECHING R...
Страница 68: ...59 TECHING R...
Страница 69: ......
Страница 70: ......
Страница 71: ...Inspection No...