42
Rail components completed
When installing two linear rails to be butted, make sure to pay
attention to the connection smoothness of these two linear
rails. You can feel it by hand or check it with an object with a
straight edge.
For each set of linear rails, tighten the screws at both ends,
and then arrange the middle three sets of small sleepers
properly to tighten the screws.
092
TECHING
R
Содержание DM21
Страница 1: ......
Страница 2: ...3 R...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Precautions...
Страница 7: ......
Страница 9: ......
Страница 15: ...6 095 037 3 1 Installation of small flue 3 Main body 2 5 Assembly of water tank assembly TECHING R...
Страница 18: ...9 095 095 015 014 005 028 3 6 Assemble the driving cab TECHING R...
Страница 35: ...26 105 053 053 033 115 053 095 026 7 Assembly of cab chassis The counterbore faces upwards TECHING R...
Страница 36: ...27 095 012 095 020 011 The side with the wide notch faces upwards TECHING R...
Страница 38: ...29 115 082 079 045 106 TECHING R Lubricant 1 positions...
Страница 41: ...32 098 098 TECHING R...
Страница 42: ...33 Note Insert 089 into the hole in 056 and then mount the screws below 095 TECHING R...
Страница 43: ...34 Flue front cover plate assembly 095 TECHING R...
Страница 44: ...35 Front shock absorber assembly 098 TECHING R...
Страница 45: ...36 Cab assembly 095 095 TECHING R...
Страница 47: ...38 Assembly of two wheeled steam train completed TECHING R...
Страница 53: ...44 Assembly completed Must pay attention to the directions of the magnet 111 and the locomotive1 TECHING R...
Страница 68: ...59 TECHING R...
Страница 69: ......
Страница 70: ......
Страница 71: ...Inspection No...