41
093
092
Assembly instructions:
1. First put the linear rail into four sets of small sleepers
and
a set of large sleepers. Must hang the hanging platforms
of all the pressure blocks on the linear rails.
2. Then tighten the screws at both ends to ensure that the
linear rails are flush with the small sleepers.
3. Evenly arrange the three small sleepers in the middle
and then tighten the screws.
Hanging platform of
pressure block
TECHING
R
Содержание DM21
Страница 1: ......
Страница 2: ...3 R...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Precautions...
Страница 7: ......
Страница 9: ......
Страница 15: ...6 095 037 3 1 Installation of small flue 3 Main body 2 5 Assembly of water tank assembly TECHING R...
Страница 18: ...9 095 095 015 014 005 028 3 6 Assemble the driving cab TECHING R...
Страница 35: ...26 105 053 053 033 115 053 095 026 7 Assembly of cab chassis The counterbore faces upwards TECHING R...
Страница 36: ...27 095 012 095 020 011 The side with the wide notch faces upwards TECHING R...
Страница 38: ...29 115 082 079 045 106 TECHING R Lubricant 1 positions...
Страница 41: ...32 098 098 TECHING R...
Страница 42: ...33 Note Insert 089 into the hole in 056 and then mount the screws below 095 TECHING R...
Страница 43: ...34 Flue front cover plate assembly 095 TECHING R...
Страница 44: ...35 Front shock absorber assembly 098 TECHING R...
Страница 45: ...36 Cab assembly 095 095 TECHING R...
Страница 47: ...38 Assembly of two wheeled steam train completed TECHING R...
Страница 53: ...44 Assembly completed Must pay attention to the directions of the magnet 111 and the locomotive1 TECHING R...
Страница 68: ...59 TECHING R...
Страница 69: ......
Страница 70: ......
Страница 71: ...Inspection No...