background image

ADCP-92-159 • Issue 1 • 2/2015

Page 3

© 2015, Tyco Electronics Corporation

Admonishments

Important safety admonishments are used throughout this manual to warn of possible hazards to 
persons or equipment. An admonishment identifies a possible hazard and then explains what 
may happen if the hazard is not avoided. These warnings are flagged by use of the triangular 
alert icon (seen below) and are listed in descending order of severity of injury or damage and 
likelihood of occurrence.

1

DESCRIPTION

The FPX 1RU and 2RU panels can accommodate up to 48 and 96 terminations, respectively. 
Typically, the panel ships empty. The panel may also be ordered with adapter packs, Multifiber 
Push-On (MPO) cassettes, splice trays, or pigtails. The panel can be configured for termination 
only (without splice trays) or for termination/splice. 

Figure 1

 shows the 2RU panel. 

 

Figure 1. FPX 2RU Panel (Front View)

Danger: 

Danger is used to indicate the presence of a hazard that 

will

 cause severe personal 

injury, death, or substantial property damage if the hazard is not avoided.

Warning: 

Warning is used to indicate the presence of a hazard that 

can

 cause severe personal 

injury, death, or substantial property damage if the hazard is not avoided.

Caution: 

Caution is used to indicate the presence of a hazard that 

will

 or 

can

 cause minor 

personal injury or property damage if the hazard is not avoided.

Note: 

The Fiber Panel Next Generation is designed to be installed in an environmentally 

controlled network telecommunications facility such as a Central Office, Controlled 
Environmental Vault, or Data Center. 

Caution: 

Adapter packs and MPO cassettes should not be both used in the same panel.

25677-A

Содержание FPX Series

Страница 1: ...mark Information 2 Admonishments 3 1 DESCRIPTION 3 2 BASIC INSTALLATION 5 2 1 Mounting Bracket Options 6 2 2 Installing the Panel on the Rack 6 2 3 Installing Vertical Cable Guides VCGs 8 continued Co...

Страница 2: ...pter Pack Assemblies and Splice Trays 19 3 8 Installing IFC OSP Cable and Preparing for Splicing 22 4 OPERATION 25 4 1 Sliding the Drawer In and Out 25 5 CUSTOMER INFORMATION AND ASSISTANCE 26 INTRODU...

Страница 3: ...n be configured for termination only without splice trays or for termination splice Figure 1 shows the 2RU panel Figure 1 FPX 2RU Panel Front View Danger Danger is used to indicate the presence of a h...

Страница 4: ...ination splice 1RU and 2RU panel respectively Figure 2 FPX 2RU Panel Internal Features Termination Only Rear View Figure 3 FPX 1RU Termination Splice Panel INDIVIDUAL SUBUNIT PROTECTIVE TUBES CABLE BR...

Страница 5: ...d installing the panel on an equipment rack installing the vertical cable guides and grounding the panel Instructions for these procedures are provided below Additional procedures after basic installa...

Страница 6: ...5 or 8 inch recess is also possible 19 inch mounting brackets are provided Figure 5 shows the available mounting options for both panels Figure 5 Selecting a Mounting Bracket Option 2 2 Installing th...

Страница 7: ...cs Corporation Figure 6 Installing 1RU Panel on Rack 23 Inch Rack Mount 2 Inch Recess Shown Figure 7 Installing 2RU Panel on Rack 23 Inch Rack Mount 2 Inch Recess Shown 12 24 SCREWS AND WASHERS 4 PLAC...

Страница 8: ...orportation 2 3 Installing Vertical Cable Guides VCGs Install the VCGs one per side as shown in Figure 8 Figure 8 Installing Vertical Cable Guides INSTALLATION HOLES FOR VCG 6 32 SCREWS 2 PER VCG PROV...

Страница 9: ...ounding cable from the lug to office ground If installing an armored OSP cable use the internal grounding stud shown in Figure 9 to ground the metallic sheath within the cable Figure 9 Grounding Locat...

Страница 10: ...our adapter packs Adapter packs are installed in the same manner for both 1RU and 2RU panels Adapter packs installed on left side of panel are angled left while adapter packs installed on right side a...

Страница 11: ...ing procedure 1 Temporarily remove the top cover so as to have access to the inside of the panel OUT POSITION IN POSITION 25680 A INSTALL ADAPTER PACKS IN ORIENTATION SHOWN INSTALL RIGHT SIDE ADAPTER...

Страница 12: ...held by a single screw If this is a 2RU panel Figure 13 remove the four semi circular radius limiters and the two brackets holding them Figure 12 Radius Limiters to be Removed from 1RU Panel Figure 1...

Страница 13: ...rom the panel Caution Adapter packs and MPO cassettes should not be both used in the same panel INSTALL LEFT SIDE MPO CASSETTES WITH ADAPTERS ANGLED TOWARD THE LEFT INSTALL RIGHT SIDE MPO CASSETTES WI...

Страница 14: ...ble clamp as shown in Figure 15 Figure 15 Cable Clamp Assembly for OSP Cable 3 5 Installing an MPO Cable With MPO Cassettes This section describes how to install an MPO cable with MPO cassettes into a...

Страница 15: ...ARITY REAR COVER REMOVED NOTE 25683 A CABLES SHOULD BE LONG ENOUGH TO COMPLETELY PULL OUT THE SLIDING TRAY NOTE MPO CABLE CONVOLUTED TUBING PROVIDED DRAWER IN CLOSED POSITION TOP COVER NOT SHOWN FOR C...

Страница 16: ...nel For details on the cable clamp itself refer to Section 3 4 on Page 14 3 Determine the cable entry location Cables may enter the panel from either top or bottom and may be clamped to either the lef...

Страница 17: ...FIBER FLARE TUBE FANOUT BREAKOUT LENGTH L2 0 0 IN 6 0 IN 0 0 CM 15 2 CM CLAMP POSITION L5 0 0 IN 6 0 IN 0 0 CM 15 2 CM FANOUT LENGTH L3 0 0 IN 6 0 IN 0 0 CM 15 2 CM 2571 A CONNECTORS CLAMP INDIVIDUAL...

Страница 18: ...ge 14 Figure 20 Typical FPX Configured with Termination Only Rear View 5 Route the cable within the panel as shown in Figure 21 and Figure 22 Figure 21 Routing OSP Cable Right Side Entry Adapter Packs...

Страница 19: ...er packs from the front side of the panel as described in Section 3 2 on Page 10 threading through the pigtails to the rear side of the adapter bulkhead Note As a rule of thumb begin with the lowest n...

Страница 20: ...there will be either a fanout chip for ribbon pigtail assemblies or a lacing tie down for stranded fibers Figure 24 Routing Pigtails from Right Side Top View 25731 A HIGHEST NUMBER POSITONS LOWEST NUM...

Страница 21: ...re 26 shows the routing for stranded pigtails within the splice tray Figure 27 shows the routing for ribbon pigtail Figure 26 Mass Fusion Heat Shrink Splice Tray Cable Routing Note In all cases pigtai...

Страница 22: ...e of the panel 2 Strip back cable sheath approximately 59 5 inches 151 1 cm to expose optical fibers Follow cable manufacturer s recommendations when stripping the sheath 3 Determine the correct clamp...

Страница 23: ...15 Tyco Electronics Corporation Figure 28 Routing OSP Cable to Splice Tray Left Side Entry Figure 29 Routing OSP Cable to Splice Tray Right Side Entry 25803 A CABLE ENTRY SPLICE TRAY FRONT SIDE 25804...

Страница 24: ...cs Corportation Figure 30 Ribbon IFC OSP Fiber Splice Tray Routing Figure 31 Stranded IFC OSP Fiber Splice Tray Routing 25724 A BARE FIBER LACING JACKETED FIBER PIGTAIL ALREADY INSTALLED 25723 A BARE...

Страница 25: ...er clips designed to ensure that the drawer is opened carefully and remains open until work in the drawer is competed These items look the same and operate the same on the 1RU and 2RU panels Use the f...

Страница 26: ...the drawer in until it locks into the closed position Figure 34 Releasing Open Drawer to Close It 5 CUSTOMER INFORMATION AND ASSISTANCE For technical support on this product call 1 800 366 3891 exten...

Страница 27: ......

Страница 28: ......

Отзывы: