Pocket SuperEASY™
Atterbury Consultants, Inc
.
19
Plot Data Edit Routine
After the plot data has been entered, tap the
Plot
option at the bottom of
the Cruise Screen. Before leaving the cruise screen you will be
prompted by the following message:
If you tap Yes the tree segments will be checked against the Sort and
Grade tables to verify that the entered tree segments meet the table
parameters. If a segment doesn’t match a parameter in one of the tables
a message will notify the user of the required edit change. The user has
the option of correcting the edit or ignoring the edit change.
If you tap on Yes you must tap on
Plot
after every edit has been
corrected in order to proceed through the edit routine. When all the edits
have been reviewed the data is saved and the user is returned to the
Plot Screen. If you click No on the “Do you want to Edit your data?” the
data is saved without being edited.
The edit routine will also run when you tap
SI
or
DW
to enter into those
screens. You will need to tap either
SI
or
DW
after every segment edit to
complete the edit routine.