background image

 

Page 

7

 of 

11

 

 

TDK-Lambda 

DBM20 

 

INSTRUCTION MANUAL

 

PA640-04-01B 

 

 

  

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4-13. The Block Diagram

  

 
 
 
 
 
 
 
 
 
 
 
 

 

AC MAINS

INPUT/OUTPUT 
voltage

Bulk capacitor 
voltage

Ready Signal

Buffer Signal

Charging

.     Mode

Ready  
Mode

Buffering

220V

Hold-up Time Power Supply

Buffer Time

Inhibit  Signal

DC OK

Ready  
Mode

Ready  
Mode

Buffering

Inhibit

(5)

 

While buffering take place, buffer signal will change from logic low to high. And Ready signal will change from 
logic high to low. 

(6)

 

During the upstream power supply is still turn ON case and customer system will like to activate the inhibit 
function by pulling inhibit signal from logic high to logic low, the buffer module will shut down the internal 
converters and bulk electrolytic capacitors will be discharged in 3 ~ 5s. 

(7)

 

Once the inhibit function is deactivated, buffer module will resume to normal operation automatically. 

Содержание DBM20

Страница 1: ...Ne pas utiliser ce produit dans des conditions anormales comme la pr sence de fum es ou d odeurs inhabituelles ou de bruits suspects etc Merci d arr ter l utilisation imm diatement et d teindre le pro...

Страница 2: ...environnement o des particules conductrices de la poussi re ou des liquides peuvent tre pr sents merci d installer des filtres afin de pr venir toute intrusion de corps trangers l int rieur du produi...

Страница 3: ...Earth Terminal RED LED Discharging Indicator LED will be ON during Buffering mode GREEN LED Charged Indicator LED will be ON during Ready mode DC OK Relay Photo Mosfet Logic low when input voltage is...

Страница 4: ...which is out of specification or reversed may damage the unit 4 2 Nominal Buffer Voltage Range 4 2 1 Fixed mode during buffering mode the nominal buffer voltage level 22 4VDC 4 2 2 VIN 1 mode during b...

Страница 5: ...uffer module provides two option for buffer voltage that is fixed mode and Vin 1 mode Executed using toggle switch to choose between the two options refer to Figure 1 At fixed mode the buffer voltage...

Страница 6: ...C input to the power supply the output from the power supply which is connected to the input output of the buffer module will charge up the internal circuit of the buffer module 2 Once the input outpu...

Страница 7: ...ffering take place buffer signal will change from logic low to high And Ready signal will change from logic high to low 6 During the upstream power supply is still turn ON case and customer system wil...

Страница 8: ...limit of withstand voltage test equipment at 100mA The applied voltage must be gradually increased from zero to testing value and then gradually decreased for shut down When timer is used the buffer m...

Страница 9: ...ng Please refer to section 6 Leave enough space surround the units to ventilate heat efficiently Minimum Installation clearances 40mm on top 20mm at the bottom A 5mm which is recommended on the left a...

Страница 10: ...citor varies depending on the method of mounting the buffer module the load current and the ambient temperature Please refer to the Electronic Capacitor Lifetime Please do not use the product which pa...

Страница 11: ...Ltd Sales Services and R D 1008 Toa Payoh North 06 01 08 07 01 03 Singapore 318996 Telephone 65 62517211 Facsimile 65 62509171 WEBSITE www tdk lambda com sg Note Name plate s contents shown in this in...

Отзывы: