
MPPT charge controller User Manual
1
3.3.2 Installation space requirements
A good ventilation can guarantee the normal operation of equipment. Please always guarantee the
enough clearance around SP upon installation. Please refer to following Figure 3-1 for minimum
clearance.
Figure 3-1 Requirement of minimum clearance
3.3 Installation
Please choose a flat surface and with 4xM5 supplied to install following Figure 3-2.
Install the SP as close to the batteries as possible reducing the voltage drop on cable for the
better performance of the equipment.
Please install four feet supplied in the accessory pack on side of the charge controller.
Please place the SP on your preference location and mark the location of four feet.
Screw tight the four screws afterwards
Figure 3-2 Illustration of installation
Please double check the SP is securely installed.
Содержание MPPT
Страница 1: ......
Страница 2: ...MPPT charge controller User Manual...
Страница 34: ...MPPT charge controller User Manual 2...
Страница 35: ...MPPT charge controller User Manual 2...
Страница 36: ...MPPT charge controller User Manual 3...