background image

 

 

Installation Checklist

 

 

 

 

Perform a site inspection prior to the installation date to check existing site conditions and identify constraints and 

limitations that could possibly cause delays or problems during the actual installation. 

 

SITE ACCESSIBILITY 

1.

 

Verify existing loading facilities and proximity of loading dock to staging area. 

2.

 

Verify if receiving area is accessible by trailer. 

3.

 

Verify access to service elevators. 

4.

 

Reserve service elevators in advance, if necessary. 

 

SITE PREPARATION 

1.

 

Clear all obstacles that could interfere with the installation process. 

2.

 

When doing a reconfiguration, ensure that all furniture to be re-used are clear of computers, accessories, 

books, papers and all personal effects. 

3.

 

Ensure that all live wires and data/communications wires are disconnected prior to installation. 

 

FURNITURE PLANS 

1.

 

Labeled furniture plans for installation purposes are located in the hardware box.  Ensure that drawings are 

complete and handy before beginning installation. 

 

STAGING 

1.

 

If damages are noticed upon opening the trailer, these must be noted by the receiver on the Bill of Lading. 

Also note any imperfections or missing components discovered while unpacking the furniture.  This 

information is necessary when requesting for product replacement and shipping claims. 

2.

 

Unpack products in the general order of installation (refer to Installation Sequence). 

 

WASTE MANAGEMENT 

1.

 

Establish a trash removal area separate from the product staging area. 

 

 

 
 

 
 

 

 
 

 

 
 

 
 

 

 
 

 
 

 

 
 

 

 

 

 

FEBRUARY 2020

kip 1

Содержание Kip

Страница 1: ...Kip installation guide February 2020...

Страница 2: ...for more information contact Installation Service toll free I 1 800 675 4092 Mon Fri I 8 30 am 5 00 pm EST www tayco com...

Страница 3: ...bleofContents General Instructions 1 03 Installation Checklist 1 Care and Maintenance 2 Application Guide 3 Kip Community Tables 04 19 Kip Community Table 1 Surface 04 Kip Community Table 2 Surfaces 1...

Страница 4: ...re clear of computers accessories books papers and all personal effects 3 Ensure that all live wires and data communications wires are disconnected prior to installation FURNITURE PLANS 1 Labeled furn...

Страница 5: ...Magic or Countertop Magic both manufactured by Magic American Corporation Painted Metals Tayco s painted metal products are powder paint coated To clean these products use a damp cloth using only a sm...

Страница 6: ...PROJECTION THIS DOCUMENT IS THE PROPERTY OF TAYCO PANELINK LTD AND CONTAINS CONFIDENTIAL AND OR PROPRIETARY INFORMATION THE CONTENTS OF THIS DOCUMENT ARE NOT TO BE REPRODUCED DISTRIBUTED EXAMINED BY T...

Страница 7: ...ure 1 Figure 2 Tools Hardware Needed 13 Place the surface face down on a clean solid surface or floor with the underside facing up Figure 1 14 Position the bridge on the surface Figure 2 Continued on...

Страница 8: ...re Needed 8540 1278 8540 0770_Dowel Drill Rubber Mallet Philips Bit Combi Dowel 6X Wooden Dowel 4X 15 Attach the combi dowels by screwing them into the pre bored holes Figure 3 16 Insert the wooden do...

Страница 9: ...holes of the gables Figure 5 18 Connect the gable to surface and press the boards together by inserting the combi dowels and wooden dowels into the holes of the gables Figure 6 19 Turn the CamFix to...

Страница 10: ...les at the corner of the bridge exposing an inch of the bolt Figure 8 22 Set in the topmost hole of the gable cover mount channel using one 10 X 1 Pan Head Screw into the pre drilled hole Note Do not...

Страница 11: ...r mount channel to the side face of the bridge before tightening the screws Figure 9 25 Tighten the 1 4 20 X 35mm JCB bolts Figure 10 26 Securely fasten the gable cover mount channel using 10 X 1 Pan...

Страница 12: ...1 Pan Head Screw 28 Securely fasten the bridge to the surface using 10 X 1 Pan Head Screws Figure 11 29 Securely fasten the bridge to gable using 10 X 1 Pan Head Screws Figure 12 30 Lift the table in...

Страница 13: ...ole and then secure it with mounting screws provided Figure 13 Note Make sure that the unit is securely installed to the mounting surface 32 Affix the faceplate by pressing it against the main unit 33...

Страница 14: ...using 10 X 11 16 Oval Head Screws into the pre drilled holes of the gable cover Figure 14 Repeat this procedure for each gable cover required 37 Angle the gable cover at 30 degrees place the gable co...

Страница 15: ...ommunity table 1 Surface Figure 16 Tools Hardware Needed 8540 1280 Drill Hex Bit 1 4 20 X 35MM JCB BOLT 8X 38 Attach the bridge cover to bridge using 1 4 20 X 35mm JCB bolts Figure 16 FEBRUARY 2020 ki...

Страница 16: ...8540 0770_Dowel Rubber Mallet Wooden Dowel 2X 1 Place the surfaces on a clean solid surface or floor with the underside facing up level the two surfaces and attach them together by inserting wooden do...

Страница 17: ...Mallet Robertson 2 10 X 1 Pan Head Screw 8X Top Bolt 4X Mending Plate 2X 2 Place the top bolt into the groove Tighten the bolt using a box wrench Figure 2 3 Attach the mending plates using 10 X 1 Pan...

Страница 18: ...8540 1278 8540 0644_CAM Drill Flat Screw Driver Phillips Bit Combi Dowel 8X CamFix 20X 5 Attach the combi dowels by screwing them into the pre bored holes Figure 4 6 Insert the CamFix into the holes...

Страница 19: ...rst to surface and press the boards together by inserting the combi dowels into the holes of the gable Figure 6 8 Turn the CamFix on both sides of the mid gable to smoothly lock the gables and surface...

Страница 20: ...SCREW 8540 1280 Drill Robertson 2 Hex Bit 10 X 1 Pan Head Screw 1 4 20 X 35MM JCB BOLT 8X 10 Please refer to pages 6 8 Follow Steps 6 14 to install the end gables Figure 8 Repeat this procedure to ins...

Страница 21: ...X 1 Pan Head Screw 11 Securely fasten the bridges to surfaces using 10 X 1 Pan Head Screws Figure 10 12 Securely fasten the bridge to gable using 10 X 1 Pan Head Screws Figure 11 13 Lift the table int...

Страница 22: ...e hole and then secure it with mounting screws provided Figure 12 Note Make sure that the unit is securely installed to the mounting surface 13 Affix the faceplate by pressing it against the main unit...

Страница 23: ......

Страница 24: ......

Страница 25: ...tayco com 0220...

Отзывы: