Assembly step 1
7
3
8
17
15
16
1
6
12
14
11
11
10 14
14
2
20
Elite Complete Trainer
Step 3:
Assembly of the Main Frame, Part 3
1. Attach the front link tube (8) to the left and right frame (3 & 2) with two bolts (12), one big
reinforcing plate (6), four washers (11), two nuts (10) and four plastic covers (14) on each frame.
2. Attach the hanging ring (15) to the front link tube (8) with two washers (17), two nuts (16) and
two plastic covers (14).
3. Now tighten all bolts and nuts from the assembly steps 1, 2 and 3 and cap each connection with
one plastic cover (14) like shown in the drawings.
Содержание SEBR7140
Страница 2: ...2 Elite Complete Trainer...
Страница 4: ...4 Elite Complete Trainer...
Страница 21: ...21...
Страница 23: ...Assembly step 2 25 23 11 14 24 22 21 9 84 14 26 9 12 14 10 11 10 14 14 11 14 11 10 14 23...
Страница 25: ...Assembly step 3 28 29 27 34 37 41 42 36 44 33 35 43 37 44 39 25...
Страница 31: ...31 Once the cable tension is correctly adjusted make sure to tighten the pulley in the pulley bracket 100 or 88...
Страница 33: ...33...
Страница 35: ...Assembly step 6 85 86 16 60 60 17 14 17 14 14 86 17 bly step 6 85 86 16 17 14 17 14 14 86 17 35 Fig B...
Страница 37: ...63 10 69 73 64 65 68 67 11 12 14 71 70 66 73 72 99 37...
Страница 41: ...41...
Страница 57: ...57 Notes...
Страница 58: ...58 Elite Complete Trainer Notes...
Страница 59: ...59...
Страница 60: ...Elite Complete Trainer...