
47
1
2
3
4
5
red
orange
green
X365
GND
GND
+
-
•
Requirement input and exit (PLC):
The thread tapping unit should be integrated in
automation by a PLC control.
Wire the exit of X367/3 ready and the input X364/3 Start 2 to a PLC – unit.
M
L+
I1 I2
Q1
Q2
1
2
3
1
2
3
4
X367
re
la
y
tr
an
si
st
or
1
2
3
4
X364
SPS
GND
+24VDC external
A
B
X364
1
2
3
4
C
X364
Q2
Option A:
The input of the thread tapping unit is connected to a relais exit of a PLC control.
(external power supply)
Option B:
The input of the thread tapping unit is connected to a relais exit of a PLC control.
(internal power supply)
Option C:
The input of the thread tapping unit is connected to a transistor - exit of a PLC control.